Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 3, 2025 at 7:00 PM
Updated December 4, 2025
Site work for a water / sewer project in Rockland, Wisconsin. Completed plans call for site work for a water / sewer project.
All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $100,000. All bids received from contractors who are not certified will be rejected. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. In general, the work consists of: the replacement of two radial dam gates that are nearing the end of their useful life on this 1960's dam. Work includes demolition and removal of the existing gates from the site and installation of new dual leaf vertical lift dam gates. Modifications to existing concrete piers include partial demolition throughout the piers' height and adding supplementary reinforcement at the location of the embedded gate frame, which will be attached to the existing concrete sill with post installed anchors. Upgrading these gates will allow for easier and safer gate operation by DNR staff, a higher level of precision for water level control, and improved vegetation and wildlife habitat management in Collins Marsh. Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.
Bid Results
Water / Sewer
$286,470.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 20, 2025
June 1, 2026
County Rd JJ, Rockland, WI
Related To This Project
Rockland, WI
--
Rockland, WI
Bid Date: Jun 05 2023
Rockland, WI
Bid Date: Aug 22 2022
West Bend, WI
--
New Franken, WI
--
Madison, WI
Bid Date: Nov 20 2025
Kenosha, WI
--
Madison, WI
Bid Date: Dec 04 2025
Madison, WI
Bid Date: Nov 19 2025
Madison, WI
Bid Date: Oct 31 2025
Appleton, WI
Bid Date: Nov 19 2025
Richland Center, WI
Bid Date: Sep 25 2025
Green Bay, WI
Bid Date: Oct 31 2025
Luck, WI
Bid Date: Oct 29 2025
Cottage Grove, WI
Bid Date: Oct 29 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
