Published November 12, 2025 at 7:00 PM

Updated November 13, 2025

Site work for a civil project in Flower Mound, Texas. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

The Project consists of furnishing all labor, equipment and materials (except as otherwise specified), and performing all work necessary for the construction of approximately 400 linear feet of 12 water line by jack and bore underneath Timber Creek. The Timber Creek Bridge Water Line Lowering project is located approximately 300 feet northwest of the intersection of Timber Creek Rd and Rollo Ct. A Bid Bond in the form of a cashiers check, a certified check, or an acceptable bidders bond made payable without conditions to the Town of Flower Mound, Texas in an amount of not less than five percent (5%) of the total amount of the bid submitted A good and sufficient performance bond in an amount not less than one hundred percent (100%) of the total amount Payment Bond: A good and sufficient payment bond in an amount not less than one hundred percent (100%) of the total amount Maintenance Bond: A good and sufficient maintenance bond in an amount not less than one hundred percent (100%) of the total amount Questions Deadline: 11/4/2025 at 12:00pm (CT) All questions must be submitted in writing (no exceptions) to purchasing@flowermound.gov. Questions will not be answered over the phone by the Engineer and/or Engineering Design Firm. Time for Substantial Completion 60 Calendar Days Time for Final Completion 90 Calendar Days Five Hundred and Zero/One Hundredths Dollars ($500.00) per day liquidated damages provision of the Construction Agreement The Town reserves the right to accept the bid which, in its judgment is the lowest responsible bid; to reject any or all bids; and to waive irregularities or informalities in any bid received, deemed to be in the best interest of the Town. Project location is adjacent to the east of 1776 Timber Creek Road, Flower Mound TX 75028

Bid Results

Bridges / Tunnels

$358,635.00

Public - City

Site Work

21

13

2

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
363
Active Projects
157
Bidding Soon
3,990
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 11, 2025

December 12, 2025

Project location map

1776 Timber Creek Rd, Flower Mound, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.