BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 5, 2026 at 7:00 PM

Updated January 6, 2026

Site work for a water / sewer project in North Attleboro, Massachusetts. Completed plans call for site work for a water / sewer project.

The work consists of demolition and replacement of the existing mechanical bar screen's components, grit classifier system, stop plates, grating, and associated piping. Work also consists of electrical upgrades to support the new and rehabilitated process equipment. Contractor Qualification DCAMM Certificate A. If there are additional painted building materials not identified in this section, to be impacted by the Contractor as part of renovation activities notify the Engineer immediately. Contractor is responsible for confirming actual quantities to form the basis of their bid. B. Assumed PCB-contaminated building materials work shall include but not be limited to the materials identified in the Assumed PCB-Containing Building Materials Schedule appended to this Section. 1. It is the sole responsibility of the Contractor to visit the site, review the Contract Documents and determine the quantities of materials to be removed when developing their Bid. C. As further detailed in this Section, no sampling and/or analysis by the Contractor or affiliates of the Contractor (subcontractors, subconsultants, etc.) for total PCBs (Soxhlet Extraction) shall be performed at any point during the performance of the work, except as specifically authorized in writing by the Owner and the Engineer. 1. The Contractor shall collect representative samples of the waste stream for PCB analysis via the Toxicity Characteristic Leaching Procedure (TCLP) for waste disposal purposes only. 2. The Contractor is responsible for selecting disposal facilities that can accept PCB wastes with this restriction. 3. If the Contractor or affiliates of the Contractor (subcontractors, subconsultants, etc.) take unauthorized samples and analyze them for total PCBs, then the contractor will be responsible for the cost of any resulting removal required under existing state and federal regulations triggered by their sampling and analysis. 4. The Owner and the Engineer shall specifically review and approve in writing a proposed testing plan prior to samples being submitted for laboratory analysis. D. In general, the following activities are minimum requirements of this Section and affect the renovations performed on building components identified and/or assumed to contain PCBs: 1. No torch cutting of PCB-contaminated building materials shall be performed. 2. No renovation/demolition activities shall occur that can reasonably be expected to increase the worker's exposure above the Permissible Exposure Limits (PEL) for PCBs unless certain worker protection is implemented. 3. Workers shall be informed of the PCB-contaminated building materials to be removed or encapsulated. 4. At a minimum, worker protection shall comply with applicable Occupational Safety and Health Administration (OSHA) standards. Worker Right to Know and Health and Safety Standards of Title 29 CFR, Part 1926, shall also apply to the work of this Section. 5. Unprotected, untrained workers or trades shall not perform any related work within or adjacent to work areas involving PCB-contaminated building materials. A. Items of work include but are not limited to the surface preparation and coating of the following: 1. Process Equipment as specified in Division 11 2. Process valves, pipes, fittings and supports as specified in Division 15 3. Electrical conduit, unless noted otherwise. 4. Touch-up painting of shop primers 5. Galvanized metal, at the locations specified on the Drawings 6. Back painting items that will be inaccessible to finish painting once installed including but not limited to lintels, door frames, window frames, clip angles, structural steel, miscellaneous metals 7. Previously painted surfaces to be recoated: a. Steel b. Other surfaces so noted or scheduled on the Drawings c. Existing pipes, fittings and supports that will not be replaced in this Project but that will be recoated as noted on the Drawings. B. Coatings are not required for glass, stainless steel, chrome, cadmium plate or aluminum that is not in contact with concrete. C. Ventilation, dehumidification, and temperature control equipment required to provide and maintain the proper environment for worker protection and for coating application and curing. D. The Contractor shall furnish to the Owner, at no charge, for use duration of this Project, dry film thickness gauge, wet film thickness gauge, adhesion testing, surface preparation testing, temperature / climate condition detectors, electrical flaw gauge and / or holiday detection equipment.

Post-Bid

Water / Sewer

$2,000,000.00

Public - City

Site Work

22

18

11

7

Subscribe For Documents

71 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
20
Bidding Soon
2,677
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2025

January 13, 2026

Project location map

To Be Determined, North Attleboro, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.