Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 9, 2026 at 8:00 PM

Updated October 15, 2026

Site work, paving, outdoor lighting and remodeling of a mixed-use development in Richardson, Texas. Conceptual plans call for site work for a playground / park / athletic field; for the remodel of a stadium; for outdoor lighting for a stadium; and for paving for a stadium.

https://www.spartnerships.com/richardson-1-4b-bond-risd-improvement-plan/ Richardson voters approved a school bond package on Nov. 4 supporting the Richardson Independent School District’s (RISD) $1.4 billion improvement plan. The bond package is made up of three measures: Proposition A, Proposition B and Proposition C, each with its own scope of projects. Proposition A covers school funding initiatives and new construction projects, while Proposition B involves the purchasing of tech devices for students and staff. Proposition C deals with the renovation of sports stadiums throughout the district. Proposition A is the largest of the three, coming in at $1.338 billion. It centers around the district’s Middle School Transformation Initiative, converting junior high schools into middle schools in order to serve grades six through eight. This effectively moves sixth grade from elementary schools to middle schools, aligning with more than 95% of Texas school districts. Six junior high schools were chosen for this round of funding, which builds on a 2021 bond package under the same initiative. The schools are Liberty Junior High, Parkhill Junior High, Richardson West Junior High, Westwood Junior High, Apollo Junior High and Richardson North Junior High. Four schools will receive brand new buildings, while two will undergo renovations as part of the Middle School Initiative. Liberty Junior High, Parkhill Junior High, Richardson West Junior High and Westwood Junior High will receive new buildings along with upgrades to HVAC systems and security features across campus. Apollo Junior High and Richardson North Junior High will undergo renovations rather than receiving new buildings. These schools will also upgrade existing campus features and equipment such as restrooms, classrooms, cafeteria and office space. Beyond the middle school transformation, Proposition A includes improvements across the district’s four high schools, 36 elementary schools and two athletic stadiums. The scope of work at each campus varies based on facility needs, ranging from single-category upgrades to comprehensive renovations spanning multiple systems. Berkner High School, Lake Highlands High School and Richardson High School are each slated for work in seven different categories, including air conditioning and heating systems, building renovations, furniture, interior improvements, roofing, security systems and technology devices. Pearce High School will receive air conditioning and heating upgrades along with security system installations. The district’s 36 elementary schools will see varying levels of improvements depending on individual campus needs. Lake Highlands Elementary and Richardson Heights Elementary are scheduled for the most comprehensive work, with improvements planned across 10 project categories outlined in the bond. Five additional elementary schools will receive extensive upgrades in nine categories: Forest Lane Academy, Forestridge Elementary, Jess Harben Elementary, O. Henry Elementary and Richland Elementary. The remaining elementary campuses will receive more targeted improvements. The bond also funds a new Career and Technical Education Center on district land next to the Richardson ISD Operations Center. The facility will serve 1,600 to 2,000 students from all four high schools, housing specialized programs like automotive training that would be too expensive to offer at each campus. Additional athletics improvements under Proposition A include LED lighting for tennis courts, uniforms for high school and junior high sports, audio equipment for venues, turf replacement, locker room updates and training equipment. The bond also covers renovations to the district’s Environmental Studies Center. RISD officials have not released specific timelines for individual projects under the $1.4 billion improvement plan. However, capital projects from the district’s 2021 bond were completed this past summer and the district has traditionally operated on a five-year bond cycle since 1996. The bond approval will result in a four-cent tax rate increase. Several neighboring districts also saw tax measures pass during the Nov. 4 election, including Garland ISD’s measure to raise teacher salaries and Rockwall ISD’s increase for safety measures and teacher compensation. Garland ISD’s tax rate increase from $1.05 to $1.17 per $100 valuation passed with about 61% support and is expected to generate $56 million in additional operational revenue. Rockwall ISD’s $16.5 million measure passed with 54% support. -------------------------------------------- The Wildcat-Ram Stadium at Lake Highlands, shared with Berkner, and the Eagle-Mustang Stadium at Richardson High School, shared with J.J. Pearce, would both receive updates Proposed projects include: Stadium Upgrades ADA seating upgrades Cost-effective LED lighting upgrades Turf replacement The turf at both facilities was last replaced with funding from the 2016 bond and is nearing the end of its lifespan. This proposition does not propose building new stadiums — only upgrading these two existing ones. This project is part of the school district’s bond that passed. TIMELINE: As of October 9, 2026, information regarding design firm and general contractor selection has not been released. Further details regarding construction and completion timelines have not been established.

Conceptual

Playgrounds / Parks / Athletic Fields

$7,400,000.00

Public - City

Outdoor Lighting, Paving, Remodeling, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
419
Active Projects
184
Bidding Soon
4,641
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2027

Project location map

Multiple Locations, Richardson, TX

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed