BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 5, 2025 at 7:00 PM

Updated November 6, 2025

This is a service / maintenance or supply contract in St. John's, Newfoundland. Contact the soliciting agency for additional information.

Closing Time: 12:00 PM (NT) ** Please note that there has been 1 addendum issued for this tender. ** Question Acceptance Deadline 2025/10/27 03:00:00 PM NDT The work shall include the supplying of all labour, materials, equipment and services necessary for the execution and completion to NL Housing's satisfaction for the price tendered all the work described in the Tender/Contract documents and below: (1) Snow Clearing (a) The Contractor shall clear all snow from all walkways, steps, landings, entrances, and entrances as indicated on Schedule "F" Maps. (b) Snow clearing must commence whenever there is an accumulation of 5cm (2") or more of snow or when wind conditions cause drifting to such a degree that it will impede the smooth flow of traffic. The Contractor must visit the site when the conditions are doubtful to make sure there will be no impediment to the flow of traffic. (c) When overnight snowfalls or drifting occurs to such a degree to warrant snow clearing, then all areas are to be cleared not later than 07:00 a.m. This will be strictly enforced unless a snow storm is in progress. (d) The Contractor must plow snow to the extremities (edge to edge) to prevent ice build up and beyond where approved by NL Housing of all the areas being cleared; (See Maps - Schedule "F"). Clear snow to parking lots/roads where required. All exits must be cleared to a public way. (e) Contractor to clear snow and ice at the end of a walkway where a street plow may have made a pass through. (f) In areas where ramps are located from the entrance and walkway, ramps and walkways to be cleared. (g) Some NL Housing buildings contain 2 exists that use the same walkway. Both exists are to be cleared to the walkway. (h) Snow shall be cleared and salt applied in such a manner to avoid leaving a build-up of any snow or ice. Any such build-up of snow or ice left on cleared areas or as requested by NL Housing is to be removed at no cost to NL Housing. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Sidewalks / Parking Lot

$103,950.00

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
13
Bidding Soon
224
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2025

November 28, 2025

Project location map

Multiple Locations, St. John's, NL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.