BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated November 27, 2025

Site work and new construction of a pre-engineered storage facility in Mount Sterling, Illinois. Completed plans call for the construction of a 15,600-square-foot pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Construction of a 5,760 gross square foot pre-engineered metal clear-span combination Office/Storage building. (Mixed Use: 1,920 SF of B Use Group & 3,840 SF of S-1 Use Group.) Building includes offices, restrooms, ready/break room, storage bays, connection to city water, septic/sand filter system, electrical, data, lighting, HVAC, man doors, overhead doors, concrete floor, concrete approach aprons, and perimeter concrete sidewalks. Alternate Bid G-1 includes demolition of the existing storage building. (D6610) Alternate Bid G-4 includes additional 30'x80' concrete approach apron. Mt. Sterling: Construction of a 5,040 gross square foot pre-engineered, unheated, wood framed Storage building of S-1 Use Group. Building includes truck storage bays, electrical, lighting, ventilation, man doors, overhead doors, concrete floor, concrete approach aprons and gravel approach driveways. Alternate Bid G-3 includes additional 30'x60' concrete approach apron and additional gravel driveway areas. Alternate Bid G-4 includes additional 20'x120' East concrete approach apron and 20'x60' West concrete approach apron. Quincy: Construction of a 4,800 gross square foot, pre-engineered wood framed, unheated Salt Storage building on 10' high, reinforced concrete bunker walls. Building is S-2 Use Group. Building also includes a 30'x 120' covered equipment storage area. Building includes is 20' high x 24' wide, with a 10' wide gabled canopy salt entry opening, electrical, lighting, ventilation, concrete floor, concrete approach apron and gravel approach driveway. All reinforcing shall be epoxy coated. All concrete shall be finished with linseed oil. All covered storage areas shall have bird netting installed on the underside of the trusses. 12% MBE/WBE and 3% VBE/PBE combined goals. location Riggston Team Section Sub Headguarters 1138 Old Route 36, Riggston, IL 62694 Mt. Sterling Team Section Sub Headguarters 100 Moreland Street, Mt. Sterling, IL 62353 Quincy Team Section Headguarters 800 Kochs Lane, Quincy, IL 62305 For additional assistance related to the e-Builder system, email CDB.eBuilderSupport@illinois.gov. Questions submitted through the e-Builder module will not reviewed or responded to. Doc Notes: The refundable set of Plans (so long as set is in good condition) can be returned for deposit refund within ten (10) days after bid opening by contractors who submit valid bids.

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$4,693,915.00

Public - State/Provincial

New Construction, Site Work

93

32

8

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
37
Bidding Soon
600
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 25, 2025

January 26, 2026

Project location map

Multiple Locations, Mount Sterling, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.