BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 1, 2025 at 7:00 PM

Updated December 2, 2025

Site work and outdoor lighting for a road / highway in Shelbyville, Illinois. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

As of December 01, 2025, this project has not yet been awarded. The project is expected to be awarded on December 02, 2025. To install streetlighting on Sylvester Drive, Shelbyville. The Contractor is required to comply with all applicable prevailing wage laws. The Contractor shall ensure that all laborers and mechanics employed on the project are paid wages at rates not less than those established as prevailing for the corresponding work classifications in the project area. The Contractor is responsible for: 1. Determining Applicable Wage Rates: Reviewing and ad-hering to the prevailing wage determinations provided in the bid documents or as issued by the relevant government au-thority. 2. Certified Payroll Reporting: Submitting accurate and timely certified payroll reports as required by law. The right is reserved to waive technicalities and to reject any or all proposals.

Bid Results

Roads / Highways

$75,556.00

Public - City

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
46
Bidding Soon
920
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2025

December 4, 2025

Project location map

Sylvester Dr, Shelbyville, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.