Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 21, 2025 at 8:00 PM
Updated October 22, 2025
Site work, paving and outdoor lighting for a mixed-use development in El Mirage, Arizona. Conceptual plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The City owns both APNs 501-45-934 and 501-45-936 and is required to complete the ultimate roadway improvements along Cactus Road. This would require half street improvements along the frontage of these parcels including an additional 31 feet of asphalt, curb/gutter, 8 foot wide sidewalks, streetlights, landscaping and a HAWK signal located near 123rd Lane. Signing and striping would also be required between 127th Avenue and El Mirage Road. Currently, the existing roadway reduces from 2 through lanes with a two-way left turn lane to a single lane, which causes potential conflicts while merging and for eastbound vehicles trying to turn left onto one of three side streets along this corridor. Widening the road would remove the need to merge and provide an additional lane for drivers to turn left in a safer manner. The project is included in the City's 2026-2030 Capital Improvement Program (CIP). Information regarding a design firm and the general contractor selection timeline has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2027-2028. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$2,133,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2028
Cactus Rd, El Mirage, AZ
Related To This Project
El Mirage, AZ
Bid Date: Aug 19 2025
El Mirage, AZ
--
El Mirage, AZ
Bid Date: Jun 02 2025
El Mirage, AZ
--
El Mirage, AZ
--
El Mirage, AZ
Bid Date: Apr 23 2025
El Mirage, AZ
Bid Date: Apr 22 2025
El Mirage, AZ
--
El Mirage, AZ
Bid Date: Jan 23 2025
El Mirage, AZ
--
El Mirage, AZ
--
El Mirage, AZ
--
El Mirage, AZ
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
