Published November 24, 2025 at 7:00 PM

Updated November 25, 2025

Renovation of an educational facility in Madison, Wisconsin. Completed plans call for the renovation of a educational facility.

This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified responsible, certified general prime contractor and this general prime contractor will enter into subcontract with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $100,000. All bids received from contractors who are not certified will be rejected. For additional information please contact: McGowan Architecture Patrick McGowan patrick@mcgowanarchitecture.com 608.235.2751 Question Deadline 11/09/2025 Bidders shall bring inadequacies, omissions or conflicts to the Architect/Engineer's attention at least ten (10) days before MEP bidding commences. Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. In general, the work consists of: fire protection renovation in the Animal Science Building on the UW-Madison campus. Work includes installing new sprinkler distribution piping and heads though out the building (12 floors) to provide complete building coverage. See the drawings for special sequencing requirements of this project. The GPC is responsible for plumbing work required by the project. Bid Result : Fire Protection - J. F. Ahern Co. - $1,159,870.00 Mechanical - IKM Building Solutions, Inc. - $43,675.00 Electrical - Forward Electric, Inc. - $176,414.00

Bid Results

Educational

$1,379,959.00

Public - State/Provincial

Renovation

58

29

18

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
122
Bidding Soon
1,637
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2025

January 19, 2026

Project location map

1670 Observatory Dr, Madison, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.