Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 21, 2025 at 7:00 PM
Updated November 22, 2025
Renovation of a municipal facility in Plantation, Florida. Completed plans call for the renovation of a municipal facility.
Reference Number 0000402073 Bid Intent Not Available The Housing Department of the Seminole Tribe of Florida is requesting bids from qualified contractors to provide roof replacement services needed at 252 Southwest 61 Avenue, Plantation, Fl,33317. Question Deadline 11/13/2025 at 5:00 PM ET Questions are submitted online Yes, Contact Person(s)*: To: TravisClark@semtribe.com Cc: BidSubmissions@semtribe.com Contact instructions are detailed in Section IV, Paragraph 1. Questions in response to this solicitation must be submitted through BidNet Direct by the Deadline for Questions Due Date and time detailed in this solicitation. The Scope of Work (SOW) contained in the Attachments as Attachment A - Scope of Work describes the services expected for CONTRACTOR to provide the TRIBE. BIDDER must ensure all such services contained in Attachment A are provided for in every particular and shall meet or exceed the level of quality, availability, features, functionality, frequency, accuracy, and performance. The silence of specifications or requirements as to any detail contained in this document or any of the Attachments, or the apparent omission from any specifications or requirements, or a detailed description concerning any point, shall be regarded as meaning that only the best commercial practices shall prevail and that only material and workmanship of the finest quality are to be used. All interpretations of the SOW shall be made on the basis of this statement. In an effort to standardize repairs/construction, the following specifications shall apply only to relevant projects. For projects which do not directly relate to bathrooms, kitchens, mechanical/HVAC, and/or water heaters, Paragraphs 2.2, 2.3, 2.4, and 2.5 do not apply. Paragraph 2.1 shall be applicable to all projects, unless otherwise noted by the TRIBE. 2.1. GENERAL NOTES: - Schedules should be submitted with all bids and updated any time there is a change - Contractors are expected to work Monday-Friday, 8:00 AM - 5:00 PM (ET) unless otherwise specified by the TRIBE's Project Manager o No work shall be performed on Tribal events, holidays, and advisory emergencies, unless otherwise determined by the TRIBE. - When installing new drywall in bedroom, living room, etc., backing must be provided for TVs being mounted on the wall - Place a chase and an outlet at the same area where backing is located - Due-rock on walls in the shower or tub area o All joints, corners, and around windows must be sealed with red guard o Extend the Dur-rock 2' on all sides beyond the shower or tub - Shower floor mortar bed, no foam or any other products should be used o Minimum 2-4% pre-slope - Liner should be water tested for 24 hours o Minimum 6 inches - All floor tile should be slip/skid resistant - Shower floor tile should be a maximum of 2x2 mesh - Provide backing for all walls inside tub/shower areas between 32" and 38" - Faucets should be Kohler or Delta - From shower diverter to shower head piping must be copper tubing and copper fittings o Secure the diverter and pipe fittings securely - When tiling the walls extend 2 feet passed the shower or tub - ADA bathroom the entire bathroom must be tile a minimum of 4 feet - All toilets must be Kohler highline - All exhaust must be vented through the roof or soffit o The exhaust fan and light for the bathroom must be on the same switch - All paint must be high gloss 2.3. KITCHEN: - All wood cabinets are required at all times, when like for like is stated if current cabinet is particle board, include in the bid the price to replace with all wood - All sinks should be deep double drop in sinks - Faucets should be Delta with a pull out spray hose - Moisture resistant (purple) drywall - Cabinet screws should be a minimum of 2 1/2 inches o Efforts should be made to find a stud - If drywall is removed from floor to ceiling, blocking must be provided for upper and lower cabinets - All microwave and kitchen hoods must be exhausted outside 2.4. MECHANICAL/HVAC: - All AC units must be installed on a metal stand with a secondary pan and connect float switch - A primary float switch must be installed and connected - When replacing duct work all joints and seams must be taped and mastic - All new HVAC units must be a minimum of 16 seer - All flexible ducts mut be a minimum of R8 R-value - All disconnects should be the pull type non-fuse - Rheem, Goodman, Night and Day units preferred - Caulk around all AC vents - Keyed lockout caps must be on all units Seal all recess lighting, caulk the lights to the ceiling Caulk around all exterior lights All exterior light fixtures must be LED Any penetration that are made through the wall to the exterior must be caulked orsealed Any new gutters must have leaf guard Any roof repairs/replacement must follow Miami-Dade standards 2.2. BATHROOM: All wood cabinets are required at all times, when like for like is stated if current cabinet is particle board, include in the bid the price to replace with all wood 2.5. WATER HEATERS: - GE brand, replaced like for like gallon size - Drain pan required - TRV piped to the outside - All water heaters should have a separate shut-off switch - New code required Energy conservation code chapter 4 - Heat traps are mandatory
Post-Bid
Municipal
$200,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 20, 2025
December 22, 2025
252 SW 61st Ave, Plantation, FL
Related To This Project
Plantation, FL
Bid Date: Feb 10 2026
Plantation, FL
Bid Date: Dec 03 2025
Plantation, FL
Bid Date: Jan 13 2026
Plantation, FL
Bid Date: Jan 06 2026
Plantation, FL
Bid Date: Mar 10 2026
Plantation, FL
Bid Date: Jan 06 2026
Plantation, FL
Bid Date: Feb 26 2026
Plantation, FL
Bid Date: Jul 09 2019
Plantation, FL
Bid Date: Jan 16 2026
Plantation, FL
Bid Date: Nov 12 2025
Plantation, FL
Bid Date: Nov 18 2025
Plantation, FL
Bid Date: Apr 16 2019
Plantation, FL
Bid Date: Jul 23 2019
Plantation, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
