BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated November 27, 2025

Site work for a development in Bloomingdale, Illinois. Completed plans call for site work for a one-story above grade development.

The Bloomingdale Township Road District is seeking bids for its Mallard Lake Drainage Improvement - Phase 2, (Section No. 24-02000-03-GM). Specifications and contract documents may be obtained through Morris Engineering, Inc., via email request. A Certificate of Eligibility from IDOT is required with the email request. Proposals should be mailed or hand-delivered to the Bloomingdale Township Road District in a sealed envelope marked "BLOOMINGDALE TOWNSHIP MALLARD LAKE DRAINAGE IMPROVEMENT PHASE 2, PROPOSAL - DO NOT OPEN." Proposals must be received between the hours of 8am and 4pm, on or before the specified deadline at the provided address. All proposals received will be publicly opened and read at the Bloomingdale Township Road District. The Bloomingdale Township Road District reserves the right to reject any or all bids, to waive irregularities in the bidding procedure, or accept the bid that, in its opinion, will serve its best interest. Proposals received after the specified time will not be considered.

Award

Conservation and Development

$358,753.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
478
Active Projects
258
Bidding Soon
3,511
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2025

December 23, 2025

Project location map

6N030 Rosedale Ave, Bloomingdale, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.