BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 23, 2025 at 8:00 PM

Updated October 24, 2025

Renovation of a mixed-use development in Columbia, Missouri. Conceptual plans call for the renovation of a medical facility.

This project involves architectural and engineering services for the tuckpointing and sealing of Building 1 at the Harry S. Truman Memorial Veterans' Hospital. The scope includes full removal and replacement of all exterior caulk and sealant joints, sealing of brick, stone, and mortar joints, and tuckpointing of failing grout/mortar joints. It also includes repairing or replacing seals around windows and storefronts, and potentially replacing them if necessary. Exterior utility infrastructure requiring environmental-controlled encasement, such as junction boxes and doghouses, will be sealed or replaced. Roof replacement is excluded, but resealing of joints and patching is included. Damaged flashing will be repaired or replaced, and additional flashing may be installed where needed. The goal is to fully seal the exterior of Building 1 to protect against environmental factors, excluding the Ambulatory Care Addition, Surgery Addition, and Community Living Center buildings. The A/E firm will provide complete design and construction documentation, including phased plans for each side of the building, itemized cost estimates, and deduct alternatives. The design must comply with all applicable building codes, VA standards, and federal guidelines. The firm must conduct site investigations, preferably using drones, and prepare as-built drawings. Deliverables include 50%, 90%, and 100% design submissions with drawings, specifications, cost estimates, and narratives. Construction period services include attending pre-bid meetings, reviewing submittals and RFIs, conducting site inspections, and assisting with document interpretations and cost proposal reviews. The A/E must respond promptly to construction issues and provide formal documentation for all site visits. The total design duration is limited to 120 calendar days. Location: Harry S. Truman Memorial Veterans' Hospital 800 Hospital Dr, Columbia, MO 65201, USA The construction magnitude for this project is $5,000,000.00 to $10,000,000.00. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Medical

$10,000,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
43
Bidding Soon
705
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2026

Project location map

800 Hospital Dr, Columbia, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.