Site work for a playground / park / athletic field in Clermont, Florida. Completed plans call for site work for a playground / park / athletic field.
The City of Clermont is seeking qualified contractors to provide all labor, materials, equipment, and supervision necessary to resurface two outdoor basketball courts, one located at Waterfront Park (100 3rd Street, Clermont, FL 34711) and the other located at Palatlakaha Park (Park Pals) (1250 12th Street, Clermont, FL 34711). The project includes the removal and disposal of the existing asphalt surface, preparation and repair of the base, and installation of a new 1.5-inch asphalt surface. Upon curing, the contractor shall apply acrylic resurfacer and color coatings, and complete all court line striping in accordance with regulation basketball dimensions and professional standards. All work must be performed in strict compliance with current industry codes, standards, and manufacturer specifications, and under the supervision of qualified tradesmen. The contractor shall fence off the work area, maintain a clean and safe job site, and remove all construction debris upon completion. The finished courts must meet all quality and performance requirements specified by the City and will be subject to inspection and approval by the City's Project Manager prior to final acceptance. Bid Opening One tap mobile +13052241968,,86221438465#,,,,*868480# US +13017158592,,86221438465#,,,,*868480# US (Washington DC) Dial by your location o +1 305 224 1968 US o +1 301 715 8592 US (Washington DC) o +1 309 205 3325 US o +1 312 626 6799 US (Chicago) o +1 646 558 8656 US (New York) o +1 646 931 3860 US o +1 360 209 5623 US o +1 386 347 5053 US o +1 507 473 4847 US o +1 564 217 2000 US o +1 669 444 9171 US o +1 689 278 1000 US o +1 719 359 4580 US o +1 720 707 2699 US (Denver) o +1 253 205 0468 US o +1 253 215 8782 US (Tacoma) o +1 346 248 7799 US (Houston) Meeting ID: 862 2143 8465 Passcode: 868480 Find your local number: https://us06web.zoom.us/u/kej9Nwvgk *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The project includes the removal and disposal of the existing asphalt surface, preparation and repair of the base, and installation of a new 1.5-inch asphalt surface. Upon curing, the contractor shall apply acrylic resurfacer and color coatings, and complete all court line striping in accordance with regulation basketball dimensions and professional standards. All work must be performed in strict compliance with current industry codes, standards, and manufacturer specifications, and under the supervision of qualified tradesmen. The contractor shall fence off the work area, maintain a clean and safe job site, and remove all construction debris upon completion. The finished courts must meet all quality and performance requirements specified by the City and will be subject to inspection and approval by the City's Project Manager prior to final acceptance. Question Deadline: November 26, 2025, 3:00pm To ensure that all prospective respondents have accurately and completely understood the requirements of this solicitation, the City of Clermont Procurement Services Department will accept written questions up Question Deadline: ALL QUESTIONS MUST BE SUBMITTED PRIOR TO THE DEADLINE. QUESTIONS WILL NOT BE ANSWERED VIA TELEPHONE OR FAX. Verbal inquiries will not be accepted A Bid Bond is not applicable to this solicitation Performance & Payment Bonds are not applicable to this solicitation The Contractor shall provide all labor, materials, equipment, supervision, and incidentals necessary to complete the resurfacing of two basketball courts. All work must comply with current codes, industry standards, and manufacturer specifications, and be performed by qualified tradesmen experienced in sports resurfacing. The Citys Project Manager will: Review the work for compliance during and after installation. Approve the schedule before work begins. Conduct final inspection prior to acceptance. All debris, excess materials, and equipment must be removed and properly disposed of before final inspection. 3.2. Waterfront Park - Concrete Court A. Surface Preparation o Clean entire concrete surface to remove all dirt, coatings, loose materials, oils, and contaminants. o Mechanically grind or shot-blast as needed to achieve a uniform, sound surface profile. o Repair any cracks, spalls, or surface imperfections using manufacturer approved concrete patching materials. o Verify the surface is structurally sound, level, and properly sloped to drain. B. Surface Testing and Patching o Flood the court to check for low areas holding water deeper than 1/8 inch (nickel depth). o Level depressions using a cementitious acrylic patching compound per coating manufacturer's recommendations. C. Coating System o Allow surface to fully dry before applying coatings Apply two (2) coats of Acrylic Resurfacer suitable for concrete substrates. o Apply two (2) coats of Color/Topcoat, per manufacturer's specifications. o Allow minimum five (5) hours drying time between coats (longer as required by weather). D. Line Striping o Apply 2-inch wide regulation basketball court lines using high-quality acrylic line paint. o Each court shall measure 84 feet long by 46 feet wide, centered in the existing area. E. Site Management o Fence the work area to prevent access by the public during construction and curing. o Protect adjacent surfaces and landscaping from coating overspray or debris. 3.3. Palatlakaha Park (Park Pals) - Asphalt Court A. Removal and Base Preparation o Remove and dispose of existing asphalt surface (existing post footers to remain). o Repair and regrade the base to ensure proper drainage and compaction before paving. B. Asphalt Installation o Install 1.5-inch thick asphalt surface across the full court area. o Flood-test the surface; repair all depressions deeper than 1/8 inch (nickel depth). C. Curing o Allow asphalt to cure a minimum of 3- days, or until fully dry and approved by City staff. D. Coating System o Clean and dry surface before coating. o Apply two (2) coats of Acrylic Surfacer. o Apply two (2) coats of Color / Topcoat in accordance with manufacturer specifications. o Allow a minimum five (5) hour drying period before line striping. E. Line Striping o Apply 2-inch wide regulation basketball lines to each court (84' x 46'). F. Site Managemen Fence off the area to restrict public access. o Remove all debris and restore the area to a clean condition upon completion. 3.4. General Provisions (Applies to Both Parks) o Reuse existing basketball posts and nets unless otherwise directed by the City. o Use coating systems specifically formulated for outdoor basketball courts and compatible with the substrate (concrete or asphalt). o All work must be performed in dry conditions, with ambient and surface temperatures above 50 F and rising. o Contractor shall submit product data sheets, color samples, and application schedule for City approval before work begins. o Upon completion, both courts must be free of puddles, surface irregularities, and loose materials Project Locations: Waterfront Park: 100 3rd Street, Clermont, FL 34711 - Concrete Basketball Court Palatlakaha Park (Park Pals): 1250 12th Street, Clermont, FL 34711 - Asphalt Basketball Court 1) Waterfront Park - Concrete Basketball Court - Nidy Sports Construction Company LLC $12,000 2) Palatlakaha Park (Park Pals) - Asphalt Basketball Courts - Nidy Sports Construction Company LLC $35,000
Award
Playgrounds / Parks / Athletic Fields
$47,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
18
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 4, 2025
January 5, 2026
Multiple Locations, Clermont, FL
Related To This Project
Clermont, FL
Bid Date: Nov 14 2025
Clermont, FL
Bid Date: Nov 11 2025
Clermont, FL
--
Clermont, FL
Bid Date: Nov 26 2025
Clermont, FL
Bid Date: Dec 11 2025
Clermont, FL
Bid Date: Jan 15 2026
Clermont, FL
Bid Date: Feb 12 2026
Clermont, FL
Bid Date: Jan 08 2026
Clermont, FL
Bid Date: Dec 18 2025
Clermont, FL
Bid Date: Nov 20 2025
Clermont, FL
Bid Date: Dec 04 2025
Clermont, FL
Bid Date: Mar 05 2026
Clermont, FL
Bid Date: Nov 06 2025
Clermont, FL
Bid Date: Nov 20 2025
Clermont, FL
Bid Date: Nov 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.