Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 16, 2025 at 7:00 PM
Updated December 17, 2025
Site work and new construction of an educational facility in Chauvin, Louisiana. Completed plans call for the construction of a one-story above grade educational facility.
The project involves the construction of a new school for Upper Little Caillou Elementary School, located at 4824 Hwy. 56, Chauvin, Louisiana. The entire scope of work is to be completed within one hundred eighty (180) calendar days from the written Notice to Proceed, with milestone phase completion deadlines identified in the Project Manual or written, approved Change Orders. Proposal prices must exclude all taxes and include any applicable shipping or transportation charges. Bids will be accepted only from contractors licensed for the classification of building construction. PROJECT DESCRIPTION: Work will include, but is not limited to: Site Demolition; Concrete Formwork; Concrete Reinforcing Steel; Cast-InPlace Concrete; Unit Masonry; Structural Steel; Metal Deck; Cold-Formed Metal Framing; Prefabricated Cold-Formed Steel Trusses; Metal Fabrications; Metal Pan Stairs; Decorative Metal Railings; Miscellaneous Rough Carpentry; Sheathing; Crystaline Waterproofing; Thermal Insulation; Fluid-Applied Membrane Air Barriers; Standing-Seam Metal Roof Panels; Roofing Installation Guarantee - Metal; Composite Wall Panels; Soffit Panels; Sheet Metal Flashing and Trim; Roof Accessories; Penetration Firestopping; Joint Firestopping; Joint Sealants; Hollow Metal Doors and Frames; Flush Wood Doors; Overhead Coiling Grilles; Bullet Resistant Doors and Frames; Aluminum-Framed Entrances and Storefronts; Security Windows; Door Hardware; Glazing; Fixed Louvers; Gypsum Board Shaft Wall Assemblies; Non-Structural Metal Framing; Gypsum Board; Ceramic Tiling; Acoustical Panel Ceilings; Resilient Base and Accessories; Resilient Tile Flooring; Resinous Flooring; Fiberglass Reinforced Panels; Wallcoverings; Sound-Absorbing Wall Units; Exterior Painting; Interior Painting; High Performance Coatings; Visual Display Units; Plaques; Dimensional Letter Signage; Room-Identification Panel Signage; Post and Panel Pylon Signage; Plastic Toilet Compartments; Cubicle Curtains and Track; Folding Panel Partitions; Wall And Door Protection; Toilet, Bath, and Laundry Accessories; Fire Protection Cabinets; Fire Extinguishers; Plastic Lockers; Aluminum Walkway Covers; Ground-Set Flagpoles; Food service Equipment; Roller Window Shades; Manufactured PlasticLaminate-Clad Casework; Quartz Agglomerate Surfacing; Bullet Resistant Partitions and Equipment; Machine Room-Less Electric Traction Passenger Elevators; Fire Protection System; Wet-Pipe Sprinkler Systems; Dry-Pipe Sprinkler System; Plumbing; Heating, Ventilation, And Air Conditioning; Electrical; Telecommunication Systems; Intercom System; Area of Rescue; Clock Systems; Fire Alarm - Voice Evac; Site Clearing; Earthwork (For Site Elements); Excavation, Filling, And Grading for Building Foundations; Termite Control; Soil Stabilization; Erosion Control; Foundation Piling; Base Course; Concrete Paving; Curbs and Walks; Pavement Markings; Traffic Signs and Signals; Chain Link Fences and Gates; Decorative Metal Fences and Gates; Lift Station Panel; Water Distribution; Sanitary Sewage; Storm Drainage; Submersible Solids Handling Pumps; Packaged Wastewater Treatment Plant Bidders must submit proposals electronically via Central Bidding, provide bid security equal to five percent (5%) of the bid amount in the form of a certified check, cashier's check, or bid bond (with an accompanying power of attorney), a completed Louisiana Uniform Public Works Bid Form, and written evidence of authority for the person signing the bid. Failure to include any required items or to properly execute forms will result in the bid being declared irregular and non-responsive. A mandatory pre-bid conference is required for all prospective bidders, who must be present for its entirety to be eligible to submit a bid. The lowest qualified bid determined to offer the best advantage will be selected, though the school board reserves the right to reject any or all bids for just cause. All other instructions contained in the Instructions to Bidders, Articles 1-10, must be strictly adhered to.
Award
Educational
$19,847,500.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 20, 2025
January 19, 2026
4824 LA-56, Chauvin, LA
Related To This Project
Chauvin, LA
Bid Date: Dec 15 2025
Chauvin, LA
Bid Date: Oct 23 2025
Chauvin, LA
Bid Date: Oct 28 2025
Chauvin, LA
Bid Date: Jul 10 2025
Chauvin, LA
Bid Date: Jun 17 2025
Chauvin, LA
Bid Date: May 29 2025
Chauvin, LA
Bid Date: Jun 20 2024
Chauvin, LA
Bid Date: Mar 06 2024
Chauvin, LA
Bid Date: Feb 22 2024
Chauvin, LA
Bid Date: Feb 06 2024
Chauvin, LA
Bid Date: Feb 12 2024
Chauvin, LA
Bid Date: Jan 25 2024
Chauvin, LA
Bid Date: Feb 06 2024
Chauvin, LA
Bid Date: Dec 21 2023
Chauvin, LA
Bid Date: Oct 26 2023
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
