BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 6, 2026 at 7:00 PM

Updated March 11, 2026

Site work and new construction of a conference / convention center in San Angelo, Texas. Completed plans call for the construction of a one-story above grade conference / convention center.

This Project is a New Re-design of a Previous Version Released in the Fall of 2025. Region 15 - New Conference Center Rebid ALTERNATE #1 Additional Parking Spaces Provide Additional Parking Spaces for a Total of (19) Additional Spaces. Refer to Site Plans. REFER TO ARCHITECTS DRAWINGS & SPECIFICATIONS ALTERNATE #2 Glass Paneled Operable Partitions Provide Glass Paneled Operable Partition in-lieu-of Solid Paneled ALTERNATE #3 Storefront I.L.O. Curtain Wall Provide Aluminum and Glass Storefront in-lieu-of Curtain Wall at Flexible Gathering 103. ALTERNATE #4 Expedite Delivery of Specified Main Distribution Panel Provide add alternate pricing and delivery date for the expediting delivery of specified Main Distribution Panel material in the appropriate location on the construction proposal form Near the completion of the project (as directed by the Construction Manager), CSP Package 31-A, Excavation shall be responsible for the following: a. Backfill curbs, sidewalks, islands, buildings, and all other items as necessary to bring grade to within +/- 0.1í of final grade as indicated in the contract documents. b. Fill tracks, ruts, and holes developed due to construction operations. c. Removal of rocks/bricks 1î in diameter and larger, trash, and all other construction debris from the entire project site. d. Removal and haul off of temporary staging areas, temporary roads and construction entrances. Prior to the start of Landscaping, CSP Package 32-B, Landscaping and Irrigation shall be responsible for the following: a. Grading, spreading, and distribution of soil to bring grade from +/- 0.1í to final grade level as indicated in the contract documents. b. Hand work and raking as necessary. c. Re-grading areas disturbed due to construction operations. d. Removal of gravel, rocks, bricks, trash and all other construction debris accumulated after the work of CSP 31-A is completed to properly prepare the site to receive landscaping. e. Removal and disposal of erosion control items, after permanent growth has been established (this will include remobilization as necessary). CSP Package 03-A shall be responsible for the following: a. Shape and grade perimeter of the building in a manner to allow the safe installation of scaffolding to 20í outside the building perimeter prior to the commencement of construction operations by others. The extent of the shaping and grading shall be completed to the satisfaction of the Construction Manager. Final grading under the building shall be performed just prior to steel erection. Completion- APRIL 1, 2027.

Post-Bid

Conference / Convention Centers

$20,000,000.00

Public - State/Provincial

New Construction, Site Work

131

33

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
0
Bidding Soon
123
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2026

April 16, 2026

Project location map

612 S Irene St, San Angelo, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.