Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 31, 2025 at 8:00 PM
Updated November 1, 2025
Site work and paving for a sidewalk / parking lot in Buffalo Grove, Illinois. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
From the Skokie Valley Path terminus at Lake-Cook Road to the entrance to the Chicago Botanic Gardens in the city of Highland Park and the Village of Northbrook. Construction of a mile-long shared-use path connection crossing US41 and the Skokie River. The Lake County Division of Transportation (LCDOT) is in the early stages of a Phase 1 feasibility study for a path connection between the Skokie Valley Path and the Chicago Botanical Gardens along Lake Cook Road. At just under a mile long, this complicated connection will involve the evaluation of how to cross US 41 and the Skokie River with an emphasis on increasing safety for the pedestrians and cyclists through the corridor. LCDOT is engaging multiple stakeholders along the route, including the Illinois Department of Transportation, the Cook County Department of Transportation and Highways, the Cook County Forest Preserve, the City of Highland Park and the Village of Northbrook. The project is included in the County's 2025-2030 Transportation Improvement Program (TIP). As of October 31, 2025, project is in Phase 1- Planning. Construction is currently planned for 2028, but will depend on available funding, property acquisition, and project readiness. Phase II: Design Engineering expected 2025-2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Sidewalks / Parking Lot
$9,306,755.00
Public - County
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2028
Lake Cook Rd, Buffalo Grove, IL
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
