Renovation of a mixed-use development in Upper Saucon Township, Pennsylvania. Completed plans call for the renovation of a educational facility.

Southern Lehigh Middle School Condensing Boiler Replacement and the Southern Lehigh High School Condensing Boiler Replacement & HVAC Upgrades . REPLACE (1) CONDENSING BOILER AND CONTROLS CONNECT TO EXISTING BOILER STACK. PROVIDE NEW DUCTWORK CONNECTION TO EXISTING OUTSIDE AIR INTAKE. DEMOLISH AND PROVIDE NEW PIPING TO NEW CONDENSING BOILER. PROVIDE NEW NATURAL GAS PIPING, REGULATOR, AND CONNECTIONS. PROVIDE CONDENSATE TRAP, NEUTRALIZER, PUMP, AND DRAIN PIPING. REPLACE EXISTING CONDENSING BOILER PRIMARY PUMP. PROVIDE (2) 6 BALANCE VALVES. REPLACE HOT WATER ISOLATION VALVES Proposed Project encompasses New Condensing Boiler and HVAC Upgrades for the Southern Lehigh High School and Condensing Boiler Replacement at the Southern Lehigh Middle School, including related general trades, HVAC, plumbing, fire suppression, and electrical work. (717) 233-4556 Electrical Construction. questions regarding the project shall be e-mailed to the attention of Rebecca Seitzmeyer at Rebecca_Seitzmeyer@eiassociates.com . Each bid shall be accompanied by a bid guarantee in the form of a certified check, a certified check, a cashier's check or a bid bond of an approved Surety Company in an amount of not less than ten percent (10%) of the amount of the bid. Check or bond shall be drawn in favor of Southern Lehigh School District. Notice is given that this construction work for which bids are being solicited constitutes a public works project subject to applicable provisions of the Pennsylvania Prevailing Wage Act. Appropriate prevailing minimum rates, as promulgated under provisions of said Act, must be paid by contractors in connection with performance of the necessary work. Notice is also given that this project is subject to the Pennsylvania Human Relations Act. The Owner reserves the right to reject any or all bids or parts thereof and to waive, at its discretion, any or all irregularities, mistakes, omissions, or informalities relative thereto. Question Deadline 11/14/2025 During the bidding period, questions regarding the project shall be e-mailed to the attention of Rebecca Seitzmeyer at Rebecca_Seitz Descriptions of Selective Work: a. Coordination of HVAC, Plumbing, and Fire Protection work with all trades and Abatement Contractor. b. Obtain permits, approvals, inspections and certifications as specified in the Contract Documents or required by the local municipality. Mechanical contractor shall prepare permit application. Engineer shall prepare the permit drawings for inclusion with the permit application. Owner will pay the permit applications fees. c. Furnishing and installing all materials/equipment specified in above reference specifications. d. Coordinate start-up services for all contracts and provide support to each as necessary. Perform all required start-up. e. Selective demolition of HVAC, Plumbing, and Fire Suppression components. f. Coordinating Work under the HVAC contract with the Work of all other Prime Contractors on the project. g. Furnishing and installing HVAC equipment specified in Division 23 and all equipment including, but not limited to, piping, piping and equipment insulation, valves, boilers, pumps, variable frequency drive, stacks and breechings, fans, rooftop air handling units, heat recovery unit, mini-split systems, dust collector, air cleaners, electric duct coils, electric radiant panels, duct mounted hot water coils, ductwork, ductwork insulation, air devices, supports, gravity roof ventilators, ventilating accessories, air handling units, rooftop units, and unit ventilators. (Electrical Contractor will furnish and install wiring for the electrically powered HVAC equipment.) h. Furnishing and installing instrumentation and control devices for HVAC systems, including thermostats, sensors, control valves, motor operated dampers, network controllers, and software updates. Furnishing and installing all low voltage wiring, conduit, connectors, and electrical boxes required to provide control circuits for the HVAC equipment. Coordinate with Electrical Contractor for installation as needed. i. Duct Cleaning. j. Delegated design and provision of wind restraints and vibration isolation components. k. Furnishing and installing all plumbing piping and equipment specified in Division 22 under this contract to include, but not be limited to, gas piping and regulators. l. Relocation of sprinkler heads and fire protection piping as required.

Award

Educational

$140,770.00

Public - County

Renovation

161

19

28

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
823
Active Projects
392
Bidding Soon
4,966
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2025

June 8, 2026

Project location map

Multiple Locations, Upper Saucon Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.