BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 29, 2025 at 8:00 PM

Updated November 25, 2025

Renovation of a water / sewer project in Fox Lake, Illinois. Completed plans call for the renovation of a one-story above grade water / sewer project.

The Village of Fox Lake is requesting proposals from qualified contractors for the NWRWRF Building 10 Rooftop HVAC Unit Replacement. Bid specifications are available online. HVAC system to replace one AAON rooftop HVAC unit for the Village of Fox Lake - NWRWRF. The NWRWRF is a regional wastewater treatment facility located in the Village of Fox Lake Illinois. The plant has a design average flow of 12 MGD and a maximum capacity of 30 MGD. There is an existing AAON rooftop HVAC unit on building 10 that NWRWRF staff are looking to have replaced. Location: NWRWRF 200 Industrial Ave Fox Lake, IL 60020 Question Deadline 11/07/2025 at 3:30 PM CT Questions should be submit ted in writ ing to Greg Adams,Assistant to the Executive Director of NWRWRF at adamsg@foxlake.org and/or John Thompson, Executive Direc tor of NWRWRF at thompsoj@foxlake.org The Contractor shall furnish all materials, tools, equipment, and labor necessary to complete the scope of services below: A. Properly removal and dispose of the existing AAON rooftop unit. B. Install a new AAON RNA-15 packaged rooftop unit, with HGRH coil. C. Reconfiguration of the existing line and low voltage wiring. D. Full start up, testing, and adjustments. E. Note: existing controls to be re-used. F. Note: Should any damage occur to the roof membrane or structure as a result of the work performed, the Contractor shall repair such damage at no additional cost to the Owner. G. Proposal cost shall include all project management, all field and administrative labor, replacement components, crane services, standard and specialty tools/equipment, equipment rental, travel, and living expenses. H. The Contractor shall perform all work in a manner that does not interfere or negatively impact treatment plant operations. Any issues brought to the Contractor's attention shall be addressed immediately. I. A pre-construction meeting will be held at a time and date TBD prior to any work being performed. The Contractor shall submit a work schedule to the Owner for review and approval at the preconstruction meeting. Substantial Completion Date: April 30, 2026

Post-Bid

Water / Sewer

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
534
Active Projects
286
Bidding Soon
3,887
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2025

December 24, 2025

Project location map

200 Industrial Ave, Fox Lake, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.