BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2025 at 7:00 PM

Updated November 15, 2025

Renovation of an educational facility in Troy, Michigan. Completed plans call for the renovation of a 50,067-square-foot, one-story above grade educational facility.

The project involves providing all labor, material, equipment, and services necessary to complete roofing work at Barnard Elementary School, Leonard Elementary School, Morse Elementary School, and Wass Elementary School; and restoration work at Baker Middle School, Bemis Elementary School, Hamilton Elementary School, Larson Middle School, Smith Middle School, and the Transportation Building for the Troy School District. All bidders must submit sealed bids online. Bid proposals must include a familial disclosure statement and an affidavit of compliance for the Iran Economic Sanctions Act. For proposals of $50,000 or more, a U.S. Treasury Listed Performance and Payment Bond for 100% of the bid is required, with the bond's cost listed in the proposal. The Troy Board of Education reserves the right to accept or reject any or all bids, in whole or in part; to award contracts to other than the low bidder; to waive irregularities or informalities; and to make awards in the manner deemed in the best interest of the owner. No oral, email, telephonic, or telegraphic proposals will be accepted. Any questions regarding bid specifications must be received by 12pm, Thursday, November 6, 2025. Questions must be submitted in writing to: acrippen@wtcg.net or (586) 731-3095 x12. No response will be made to oral questions. SCOPE This bid includes reroof for several building districtwide for Troy Schools. Proposals will be on a lump sum basis, according to the schedule listed below, and where specified only the qualified products listed will be considered in this proposal School Address Reroofing Sq. Ft. Restoration Only TSD 2026 Roof Work Project Time Frame Barnard Elementary School 3601 Forge Dr, Troy, MI 48083 13,787 RA C, D 6/4/26-8/14/26 Leonard Elementary School 4401 Tallman Dr, Troy, MI 48085 9,180 RA A, E 6/4/26-8/14/26 Morse Elementary School 475 Cherry Dr, Troy, MI 48084 21,600 RA E, F 6/4/26-8/14/26 Wass Elementary School 2340 Willard Dr, Troy, MI 48085 5,500 RA C 6/4/26-8/14/26 Baker Middle School 1359 Torpey Dr, Troy, MI 48083 X RA A, C & D Anytime after PO is issued Bemis Elementary School 3571 Northfield Pkwy, Troy, MI 48084 X RA A, B & C Anytime after PO is issued Hamilton Elementary School 5625 Northfield Pkwy, Troy, MI 48098 X Anytime after PO is issued Larson Middle School 2222 E. Long Lake Rd, Troy, MI 48085 X Anytime after PO is issued Smith Middle School 5835 Donaldson Dr, Troy, MI 48085 X RA B, C, E, F, G & H Anytime after PO is issued Transportation Building 120 Hart Dr, Troy, MI 48098 X RA A Anytime after PO is issued INSPECTION OF SITE 1. Inspection of sites will not be possible due to the multiple locations throughout the Troy School District. 2. Bidders will be held to have compared the premises with the specifications and to have satisfied themselves as to the conditions of the premises and any other conditions affecting the carrying out of the work. No price allowance or extra consideration on behalf of the contractor(s) will subsequently be allowed by reason of error, oversight, or failure to reasonably inspect on the part of the bidder(s) and/or contractor(s). WORK COVERED BY CONTRACT DOCUMENTS A. The Roofing Contractor shall be considered the prime contractor and include in his base bid, all cost relating to: 1. Troy School District (TSD) 2026 Roof Program work for four (4) schools approximately 50,067 sq. ft. and restoration for five (5) schools and one (1) district building. Roofing work includes roof replacement and restoration required to remediate all defects identified in the restoration schedules and drawings inclusive of all Bid Documents requirements. 2. Schedule: a. Reroofing Work: Contractor(s) will have approximately 45 work days to substantially complete the project starting at the end of the academic year on or about June 15, 2026 and substantial completion on or about August 14, 2026 on ALL schools from the date of the Notice to Proceed. 3. Multiple Contracts: TSD, the Owner, reserves the right to award contracts to multiple contractors in order to insure the work is completely on time to meet the Schedule Custom Bid Result. Barnard Elementary School: MTD Construction $207,000.00 Leonard Elementary School: Sterling Roofing LLC $147,200.00 Morse Elementary School : MTD Construction $261,000.00 Wass Elementary School: Sterling Roofing LLC $88,000.00 Restoration Package: Schena Roofing $33,315.00

Bid Results

Educational

$736,515.00

Public - City

Renovation

23

17

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
345
Active Projects
209
Bidding Soon
2,434
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2025

June 15, 2026

Project location map

Multiple Locations, Troy, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.