BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 17, 2025 at 7:00 PM

Updated November 18, 2025

Site work for a library in South Pasadena, California. Working plans call for site work for a library.

**As of November 17, 2025 project has been canceled. As of this time it is unknown if an when project will rebid. The scope of work includes renovations for the NE ramp at the library. Provide all work, including labor, materials, equipment, incidentals and appurtenances to complete the project per the approved plans titled SOUTH PASADENA LIBRARY RAMP UPGRADE dated 8/1/2025 by ONYX Architects. Scope to be included as the contractor's responsibility encompasses all plan representations, notes, compliance references and is inclusive of work described in the following narrative: 1. Removal of existing noncompliant ramp handrails. 2. Removal of existing metal curb/barrier on north side of walkway and replacement with new guardrail to match existing adjacent guardrail. 3. Installation of new ADA compliant handrail along entire guardrail. Handrail will have integral low voltage LED lighting pucks to illuminate surface of accessible route. 4. Provide all electrical connections for the new LED lighting. Demonstrate working lighting and replacement of lights for the library and City staff in a training exercise. In addition to the LED lights installed, deliver 20 duplicate LED fixtures and lighting installation tools as attic stock for future replacements if necessary. 5. Installation of lighting bollards adjacent to existing tree. 6. Removal of door closer at Library existing balcony and installation of spring hinges in lieu of closer. 7. Provide waterproofing barrier on the library building exterior wall at the exposed section beneath the existing ledge and extending down to 3 feet below grade before backfilling. Product specifications for GMX Cold Fluid-Applied Waterproofing Ultra-Guard Elastomeric High Build are included as an attachment with this RFP. 8. Installation of new concrete drainage swale and drainpipe at north wall of Library. Note: concrete swale shall be shaped so that the sides follow the westward slope of the ramp yet have a centered watercourse trough inversely sloping eastward for water drainage to the east around the northeast corner of the building. 9. Related work / deferred approval. Electrical wiring, transformers, controls and related Title 24 forms. 10. Debris bins and storage containers for equipment/materials is the responsibility of the contractor. Question Deadline 11/10/2025 at 4:00 PM PT Online Q&A Yes. Project has been cancelled

Final Planning

Library

$90,000.00

Public - City

Site Work

12

6

4

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
626
Active Projects
326
Bidding Soon
3,275
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2025

May 17, 2026

Project location map

1115 El Centro St, South Pasadena, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.