BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2025 at 8:00 PM

Updated October 29, 2025

Site work, paving and outdoor lighting for a mixed-use development in Ankeny, Iowa. Conceptual plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Extension of NW 18th Street from NW Spruce Drive west approximately 2,700 feet to IA Highway 415. It is proposed to be a 41-ft. wide concrete street with a two-way left turn lane and curb and gutter. The project will also include 8-ft. wide sidewalk on the south side, sanitary sewer, storm sewer, water main, street lighting, fiber optic and conduit, signing, and street trees. In addition, the proposed project includes a traffic signal at the intersection of NW 18th Street and IA Highway 415, and northbound and southbound turn lanes from IA Highway 415 onto NW 18th Street. Approximately $2,100,000 of the estimated $7,950,000 total construction cost is associated with the construction work on IA Highway 415. It is anticipated that the engineering and construction work on IA Highway 415 would be cost-shared with Polk County and the Iowa DOT. The proposed project schedule assumes consultant survey and preliminary design in 2027; right-of-way acquisition and final design in 2028; construction, consultant inspection, and street lighting of NW 18th Street in 2029 and 2030 (equal costs in both years); and construction and consultant inspection of IA Highway 415 and street trees in 2031. The project is included in the City's 2025-2029 Capital Improvement Program (CIP). As of October 28, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$2,925,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
103
Bidding Soon
1,159
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2030

Project location map

NW 18th St, Ankeny, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.