Published January 14, 2026 at 7:00 PM

Updated January 15, 2026

Site work for a water / sewer project in Tulsa, Oklahoma. Completed plans call for site work for a one-story above grade water / sewer project.

As of January 14, 2026 the project has been awarded. Furnishing all tools, materials and labor and performing the work necessary for the construction of Project No. ES 2024-04 Crow Creek Specific Remediation Plan for the Tulsa Metropolitan Utility Authority. Pre-qualification requirements: Bids will only be accepted from holders of valid pre-qualification certificates from the City of Tulsa in one or more of the following classifications: A or D. Attendance at the mandatory Pre-Bid Conference is required; bids will not be accepted from contractors who did not attend. Bidders are required to comply with employment non-discrimination laws, commit to the employment goal of at least fifty percent bona fide residents of the City of Tulsa and/or MSA in each classification, and hire only citizens of the United States for the work. Certified or cashier's check or bid surety bond for 5% of the bid amount is required. Public liability and workmen's compensation insurance, Performance, Statutory, and Maintenance bonds for 100% of the contract price are required if awarded the contract. Bids must be submitted with proof of these qualifications and attendances. Instructions to bidders: Attendance at the Pre-Bid Conference, obtaining and reviewing project plans and documents, providing required bid surety, insurance, and bond documents per instructions, and compliance with employment and legal requirements as specified above. Bids must be delivered by the stated deadline to the City Clerk, and only by pre-qualified bidders in the appropriate classifications. Payment for documents is non-refundable and to be made by check or money order to the Tulsa Metropolitan Utility Authority. The Authority is exempt from sales/use tax, and vendors may exclude such tax from their bids accordingly. The entire cost of the improvement shall be paid from Account No. 2131S0005Z.SewerLines.Sewer.7500N.75003300.541101 203320004Z.SewerLines.SwrLine.7500N.75003300.541101 2331 S00008.SewerLines.Sewer.7500N.75003300-541101 2431 S00008.SewerLines.Sewer.7500N.75003300.541101 2531 S00030.SewerLines.Sewer.7524.75243300.541101 The Performance, Statutory, and Maintenance bonds shall be for one hundred percent (100%) of the contract price. 8 Inch Point Repair Additional Footage (8 Inch Point Repair) 8 Inch Slipline, SDR 21 8 Inch Slipline, SDR 17 8 Inch Cured-ln-Place-Pipe 8 Inch Pipeburst, DR-17 DIPS HOPE 8 Inch Open Cut Only, SDR 26 PVC 12 Inch Slipline, SDR 21 12 Inch Cured-ln-Place-Pipe 12 Inch Pipeburst, DR-17 DIPS HDPE 15 Inch Point Repair Additional Footage (15 Inch Point Repair) 15 Inch Slipline, SDR 21 15 Inch Cured-ln-Place-Pipe 15 Inch Pipeburst, DR-17 DIPS HDPE 15 Inch Open Cut Only, SDR 26 PVC 24 Inch Pipeburst, DR-17 DIPS HDPE Obstruction Removal External Drop Replacement Flowable Fill Pavement Removal and Replacement -Asphalt Pavement Removal and Replacement -Concrete Pavement Removal and Replacement -Concrete Driveway, Sidewalk Curb and Gutter Removal and Replacement Sodding Service Reconnections PVC Service, Schedule 40 Video Pre-lnspection Replace Cover, Frame and Frame Seal Replace Frame Seal Replace Cover, Frame and Frame Seal, and Chimney Replace Frame Seal, and Chimney Partial Manhole Replacement - Precast Corbel Section Interior Manhole Wall Rehabilitation Bench and Invert Rehabilitation Grout and Coat Pipe Seal Plug Lift Holes , Plug Holes Seal Precast Joints Patch Lift Hole/ Patch Hole Epoxy Coating Manhole Step Removal and Replacement Manhole Replacement (4 Ft ID) Manhole (4 Ft ID) Additional Vertical Foot over 6 Ft depth Drop Manhole Replacement (4 Ft ID) Drop Manhole (4 Ft ID) Additional Vertical Foot over 6 Ft Depth Manhole Replacement (5 Ft ID) Manhole (5 Ft ID) Additional Vertical Foot over 6 Ft Depth Drop Manhole Replacement (5 Ft ID) Drop Manhole (5 Ft ID) Additional Vertical Foot over 6 Ft Depth Lamphole Replacement Lamphole Frame and Cover Sealed Lid Clean Manhole Construction Traffic Control Mobilization Photographic Documentation Owner Allowance Construction As-Builts Contractor's Quality Control SWPPP Documentation and Management ADD ALTERNATE 1 - 8 Inch Point Repair 8 Inch Slipline SDR 21 8 Inch PipeBurst, DR-17 DIPS HDPE 8 Inch Open Cut Only, SDR 26 PVC 10 Inch Open Cut Only, SDR 26 PVC 10 Inch Cured-ln-Place-Pipe Pavement Removal and Replacement Asphalt Pavement Removal and Replacement Concrete Pavement Removal and Replacement - Concrete Driveway, Sidewalk Curb and Gutter Removal and Replacement Sodding Service Reconnections PVC Service, Schedule 40 Video Pre-lnspection complete said work within 400 calendar days Question Deadline 12/04/2025 at 5:00 PM CT Online- Each bidder shall submit the Questionnaire directly to the Engineer no later than 5:00 p.m. on the first working day following the bid opening.

Award

Water / Sewer

$4,891,111.00

Public - County

Site Work

46

7

16

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
64
Bidding Soon
851
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2025

February 3, 2026

Project location map

Multiple Locations, Tulsa, OK


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.