Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 2, 2025 at 7:00 PM
Updated December 3, 2025
Remodeling of a municipal facility in Missoula, Montana. Conceptual plans call for the remodel of a municipal facility.
The Public Works and Mobility Department collaborated with A&E Design to develop the programming and concept design for the building and site improvements at 1345 W. Broadway. Given at least a 15-year occupancy timeline, the team assessed the current building program, infrastrastructure and utiliziation, and strived to maximize the value of the building to meet department needs for the near future. Several systems (HVAC, plumbing, electrical, etc.) within the building are beyond their useful lifespan and need to be upgraded to remain viable and to service new functions proposed within the building. The Broadway Building currently supports 62 employees, many of which have desks that are located in makeshift and crowded spaces, and materials and equipment for daily operations. In its current state, the building does not have the capacity to support any additional FTEs, equipment, and materials. The projected cost comparisons to potentially remodel the Zip Beverage building is approximately $31.5 million (includes purchase of building) and to build new is approximately $41 million (does not include purchase of land). The water debt service (49%), stormwater debt service (6%), and Road District #1 debt service (45%) will fund this $9.3 million remodel project over multiple years. The project is included in the City's 2026-2030 Capital Improvement Program (CIP). As of December 2, 2025, information regarding design firm and construction manager has not been released. Further details regarding construction and completion timelines have not been disclosed. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Municipal
$9,331,166.00
Public - City
Remodeling
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
1345 W Broadway St, Missoula, MT
Related To This Project
Missoula, MT
Bid Date: Dec 19 2025
Missoula, MT
Bid Date: Dec 09 2025
Missoula, MT
Bid Date: Jan 26 2026
Missoula, MT
Bid Date: Jan 08 2026
Missoula, MT
Bid Date: Jan 14 2026
Missoula, MT
Bid Date: Jan 15 2026
Missoula, MT
Bid Date: Jan 13 2026
Missoula, MT
Bid Date: Jan 27 2026
Missoula, MT
Bid Date: Dec 10 2025
Missoula, MT
Bid Date: Dec 11 2025
Missoula, MT
Bid Date: Dec 11 2025
Missoula, MT
Bid Date: Dec 09 2025
Missoula, MT
Bid Date: Dec 09 2025
Missoula, MT
Bid Date: Nov 25 2025
Missoula, MT
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
