BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2025 at 7:00 PM

Updated November 13, 2025

Site work for a civil project in Gambo, Newfoundland. Completed plans call for site work for a water / sewer project.

Closing Time: 3:30 PM (NT) This is the first phase (Phase 1) of a two-phase competition: the first phase will evaluate the qualifications of all bidders; second phase (Phase 2) will invite the qualified bidders to provide a financial bid on the project based on the specifications and drawings. Upon award of contract in Phase Two the pre-qualification list will be terminated, no additional contracts will be awarded. This project aims to address the flood damage at the site by remediating the washout areas, constructing drainage channels to better handle future water flow, and constructing protective measures to prevent future floods from entering the site/structure. Work to remediate the washout areas includes debris and material removal/disposal and replacement of washed-out granular materials to original grades. Work to construct new drainage channels includes site grading for construction of new rock drainage swales and construction of two new reinforced concrete swale inlet aprons. Work items included in the new flood protection structures includes placement of 500 mm dia. rip-rap to enhance existing shoreline protection and construction of a reinforced concrete fishway wall extension with stop log support blocks and drainage passthroughs (complete with galvanized steel trash racks). Other work items include three new movable wooden stairways, removal/modification/reinstallation of existing chain-link fencing and metal handrailing, supply/installation of timber stop logs, establishment of a new vertical control benchmark in the existing concrete staircase, site restoration and cleanup, and any other items noted on the drawings/specifications. The contractor must take all appropriate safety measures prior to conducting any site visit. The Contractor must perform and complete the Work by March 31st, 2026.

Post-Bid

Water / Sewer

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
1
Bidding Soon
70
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2025

December 12, 2025

Project location map

To Be Determined, Gambo, NL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.