BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 13, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a parking garage in Stonewall, Manitoba. Conceptual plans call for site work for a parking garage.

Construction of a detached insulated garage (approximate size for Stonewall is 30x38, the others are 30x30), for RCMP's operational use. Stonewall detachment to have a different design (i.e. longer and taller than other garage builds. Different vehicles to be stored). No EV electrical infrastructure required. RCMP Sustainability requirements to apply, as these buildings are heated (e.g. unit heater hanging from ceiling). Civil work would need to be done prior to the building, ensuring a solid foundation (slab on grade, no oversized vehicle) and adequate drainage. Electrical would require at a minimum a 100 amp panel but depending on what operational activities are to take place in the garage, the panel may need to be upsized. No EV electrical infrastructure required. There is no building automation in the detachments. A unit heater would still be required. CAT6 lines should be run from the detachment for security. Garage build sites at: GOC04456 - Ste Rose du Lac, GOC04465 - Swan River Detachment, GOC04462 - Stonewall Detachment and GOC04403 - St Pierre Detachment. RCMP confirmed the following: CORCAN would no longer be involved. 5" slab is likely insufficient. It is noted that an 8" thickened edge is required on the plans. Ventilation is not required, as RCMP will not be storing 5 or more vehicles. Topo survey should not be required (remove topsoil, add base up to appropriate grade). Should aim to begin construction before Aug 31 2026. Ceiling fan not required. HVAC not required. CO and exhaust only required if a code requirement. Ensure compliance with latest applicable Code requirements. Provide Design based on best "Value to Canada"/Minimum Viable Option (MVP). TIMELINE: An Request for Quote for design has been awarded, details will not be released for publication. Updates will be made if tenders are issued for construction. Coverage discontinued at this time.

Project Abandoned

Parking Garage

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
61
Bidding Soon
512
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2026

Project location map

Multiple Locations, Stonewall, MB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.