BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2025 at 7:00 PM

Updated November 22, 2025

Site work and paving for a mixed-use development in Athens, Texas. Completed plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The engineered construction plans, contract documents and technical specifications detail the work to be performed for the Access Road Fire Lane, Sidewalks, and Parking Lot - Softball Field [Phase 2] at the Athens Campus for Trinity Valley Community College. Question Deadline 11/06/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. Trinity Valley Community College will receive sealed bids for the construction of the Access Road Fire Lane, Sidewalks, and Parking Lot - Softball Field [Phase 2] at the office of Frentress Engineering LLC. Bid security shall be furnished in accordance with the Instructions to Bidders. Trinity Valley Community College reserves the right to reject any or all bids and to waive any formalities. No Bidder may withdraw their bid within 60 days after the actual bid opening date.

Post-Bid

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

35

12

76

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
319
Active Projects
154
Bidding Soon
2,780
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2025

January 19, 2026

Project location map

100 Cardinal Dr, Athens, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.