BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a bridge / tunnel in Moraga, California. Design plans call for site work for a bridge / tunnel.

As of May 13, 2026, an engineer has been selected for the project. Per the owner, a firm timeline for construction has not been established. *The closed solicitation has been included below for reference: The Town of Moraga ("Town") seeks proposals from qualified civil and environmental engineering firms to provide design and related professional services for the Canyon Road Culvert Replacement Project. The project is financed through the Federal Highway Administration (FHWA) Emergency Relief (ER) Program and local Road Maintenance and Rehabilitation Account (RMRA) funds. This project replaces a damaged culvert and restores roadway and drainage infrastructure consistent with FHWA ER Program requirements This solicitation follows the One-Step Request for Proposals Method as defined in the Caltrans Local Assistance Procedures Manual (LAPM), Chapter 10. All work shall comply with applicable federal, state, and local requirements, including 23 CFR 172, 2 CFR 200, and the Brooks Act (40 U.S.C. 1101-1104). The selected Consultant will provide project management, engineering design, environmental documentation, and support through bidding and construction. The Town anticipates executing a single agreement encompassing preliminary engineering, right-of-way, environmental, and construction engineering services. The project has a compact completion schedule due to ER funding requirements. Any questions related to this RFP shall be submitted in writing to the attention of Town of Moraga via both emails at publicworks@moraga.ca.us and sknapp@moraga.ca.us. Questions shall be submitted no later than 5:00 PM on Monday, October 27, 2025. No oral question or inquiry about this RFP shall be accepted. The Town reserves the right to reject any or all proposals, to waive informalities, and to negotiate with any qualified respondent in the best interest of the Town. This RFP does not commit the Town of Moraga to award a contract, to pay any costs incurred in the preparation of a proposal for this request, or to procure or contract for services. The Town of Moraga reserves the right to accept or reject any or all proposals received as a result of this request, to negotiate with any qualified Consultant, or to modify or cancel in part or in its entirety the RFP if it is in the best interests of the Town of Moraga to do so. Furthermore, a contract award may not be made based solely on price. The method of Contractor Selection has not been Determined at this time.

Design

Bridges / Tunnels

$2,705,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
473
Active Projects
214
Bidding Soon
2,451
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2027

Project location map

Canyon Rd, Moraga, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.