Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 26, 2025 at 7:00 PM
Updated December 27, 2025
Renovation of a military facility in Brazoria, Texas. Completed plans call for the renovation of a military facility.
**As of December 26, 2025, the project was awarded to S & C Service Enterprises, LLC, with an awarded amount of $62,741.89** The Texas Department of Criminal Justice is requesting bids to establish a purchase order for the removal and replacement of the R-panel metal roofing for employee housing at the Clemens Unit. For Questions or Inquiries Contact: Brandy Hairell, Ctcd , Ph: 936-437-3874 Email: Brandy.hairell@tdcj.texas.gov Lucerito Moreno Pineda, Ctcd, Ph: 936-437-3872 Email : Lucerito.moreno-pineda@tdcj.texas.gov Tdcj Contracts and Procurement Two Financial Plaza, Suite 703 Huntsville, Tx 77340 Statement of Work: a. All work performed must follow all Federal, State and Local laws and codes, guidelines, and standards.Project Overview: a. This scope of work outlines the requirements for the removal and replacement of the existing composition shingle roof and associated components. The contractor shall assess structural elements for damage, replace deteriorated materials, and ensure compliance with applicable building codes. Employee Housing Building numbers to receive roof replacement are as follows: i. Clemens Unit - Four-plex #1436 ii. Clemens II Unit (Scott) - BOQ #1962 LETTER OF INSTRUCTION CLEMENS UNIT AND CLEMENS II UNIT (SCOTT) REPLACE ROOFS - EMPLOYEE HOUSING MWR# 00525001 & 01924004 Structural Repairs and Painting: a. Repair or replace all fascia and soffit on second-story eaves as needed. b. Ensure all new wood components are sealed and painted to match existing. Our mission is to provide public safety, promote positive change in offender behavior, reintegrate offenders into society, and assist victims ofcrime. Demolition and Preparation: a. Remove and dispose of existing composition shingles, drip edge, and associated roofing materials. b. Assess and document the condition of fascia boards, rafters, soffits, vents, roof jacks, and decking. c. Remove and replace all deteriorated or damaged components as necessary. d. Remove inactive equipment to include satellite dishes to be identified by TDCJ Personnel. Installation of New Roofing System: a. Install new composition shingles with appropriate ridge cap per manufacturer installation instructions. b. Apply new synthetic underlayment per manufacturer specifications. c. Install new d-style drip edge along all applicable roof perimeters (colors to be approved by TDCJ Personnel). d. Install and seal all new necessary roof vents, roof jacks, and flashing. e. Ensure proper fastening and alignment of roofing materials per code requirements as well as manufacturer instructions. f. Install rain diverters over front and back doors where applicableCleanup and Waste Management: a. Maintain a clean job site and dispose of debris daily. b. Remove all materials and waste from the property upon project completion. c. All materials and debris are the responsibility of contactor to properly dispose of. d. Upon completion contractor is required to clean-up premises to include magnetic nail sweep of all areas within construction area. Compliance and Documentation: a. Provide a processed, certified letter from a licensed professional in Texas verifying that the installed roof system meets applicable building codes. b. Ensure compliance with local, state, and national building regulations. c. Provide warranties for both the roofing installation and materials from the installer and manufacturer. General Requirements: a. Roof shingles shall be composition shingles with limited lifetime warranty from manufacturer (or 50-year warranty) and Seven (7) years minimum from installer. b. Roof shingles shall be certified for 110MPH wind resistance minimum. c. Underlayment to be Synthetic Underlayment with minimum 20-year warranty. d. Contractor must be licensed, insured, and experienced in roofing projects of similar scope. e. Work shall be performed in accordance with industry best practices and manufacturer recommendations. f. The contractor shall coordinate with the owner to minimize disruptions during the project. g. Contractor shall protect all existing structures, shrubs, and tenant owned property during the project and take caution in keeping all entrances free of Hazards. h. Facility must be protected from weather at all times. i. Contractor to return all landscaping/lawn areas to pre-construction condition
Award
Military
$62,742.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 4, 2025
February 2, 2026
11034 TX-36, Brazoria, TX
Related To This Project
Brazoria, TX
Bid Date: Dec 02 2025
Brazoria, TX
Bid Date: Dec 30 2025
Brazoria, TX
Bid Date: Nov 07 2025
Brazoria, TX
--
Brazoria, TX
Bid Date: Nov 11 2025
Brazoria, TX
Bid Date: Oct 02 2025
Brazoria, TX
Bid Date: Sep 10 2025
Brazoria, TX
Bid Date: Sep 04 2025
Brazoria, TX
Bid Date: Jul 15 2025
Brazoria, TX
Bid Date: May 01 2025
Brazoria, TX
--
Brazoria, TX
Bid Date: Dec 05 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
