BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2025 at 7:00 PM

Updated December 5, 2025

Site work for a road / highway in Lawrenceville, Georgia. Completed plans call for site work for a road / highway.

This work will consist of installing two new separate single phase underground loops through two existing neighborhoods. The current primary cable feeds through the back yards of one development and in front of the other development, with many secondary cables going from the transformers in the back yards to the meter bases on the back of the townhomes. This full reconduct will be installing new primary and transformers on the roadside of the buildings and running 350 triplex behind the buildings to UV-4 pedestals and capturing the old services. All conductors are to be installed in conduit or pipe. Work will consist of installing approximately 3,150 feet of 1/0 underground primary, inside 2-inch conduit. There will be 11 new pad mount transformers (25kva-100kva) installed with concrete pads and grounding assemblies and 2 old transformers (25kva-75kva) that will stay in place with grounding assemblies added. There will be 26 primary terminations, inside the pad mount transformers. Approximately 950 linear feet of 350 underground triplex will be run in 3-inch conduit, from the transformer locations to the 9 new UV-4 pedestals in the back yards. The UV-4 pedestals will be installed with grounding assemblies per Lawrenceville Powers Specs. There are also 7 existing light poles in the development that will consist of running 360 linear feet of #6 duplex in 2-inch conduit to provide new feeds for these lights. Each of these lights will need a UV-2 hand hole box installed according to Lawrenceville Powers Specifications. There will also be 3 Town and Country lights installed at 3 transformer locations, with 20-foot direct bury poles. There will be 4 UM2 (Riser poles), one at each entrance that will need to be terminated, ran up the pole, and have u-guard installed to Lawrenceville Powers spec. The contractor will be responsible for all switching procedures throughout the entire project, including the energizing of the new riser poles. Questions regarding bids should be directed to Chris Duncan, Buyer, at chris.duncan@lawrencevillega.org or by calling 678-407-6421, no later than 2:00 P.M. on Thursday November 20, 2025. Bids are legal and binding upon the bidder when submitted. The City of Lawrenceville reserves the right to reject any or all bids to waive technicalities, and to make an award deemed in its best interest. Bids may be split or awarded in entirety.

Post-Bid

Roads / Highways

$320,000.00

Public - City

Site Work

3

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
154
Bidding Soon
1,926
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2025

January 2, 2026

Project location map

Longleaf Dr, Lawrenceville, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.