BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 31, 2025 at 8:00 PM

Updated November 1, 2025

This is a service / maintenance or supply contract in Kewanee, Illinois. Contact the soliciting agency for additional information.

Phase III engineering services are required for construction contract 64L94: 0.91-mile reconstruction of IL81 in Kewanee, which includes new pavement and widening, curb and gutter, bicycle lane, sidewalk, ADA accommodations, multi-use path, storm sewer, and retaining wall adjustment. The Consultant must provide sufficient staff to perform all engineering services required to complete the project in accordance with departmental guidelines. This may include, but is not limited to all on-site construction inspection, documentation of pay quantities and related forms for record keeping, Construction & Materials Management System (CMMS) documentation, onsite Quality Assurance material testing, verification of construction layout including GPS work for layout and documentation, submittal of pay estimates, change orders, as-built survey, night-time inspection as needed, and all other work required to complete the projects. The Consultant will be responsible to ensure contractors complete the work in accordance with the plans and specifications. It is anticipated the department will do all off-site material inspection for the project, and the Consultant will do all on-site material inspection including PCC Quality Assurance testing as needed. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The anticipated construction completion date is May 31, 2028, with substantial project closeout documentation completion by December 31, 2027. The Consultant must complete and submit final measurements, calculations, and final contract records documents to the department no later than six (6) weeks after the completion of the project. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). ILDOT - 8 - RFQ - IL 81 From 0.1 Mile West of Union Street

Conceptual

Sidewalks / Parking Lot

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
77
Bidding Soon
1,057
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2026

Project location map

IL-81, Kewanee, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.