Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 5, 2025 at 7:00 PM
Updated December 6, 2025
Renovation of a clubhouse / community center in Amarillo, Texas. Working plans call for the renovation of a clubhouse / community center.
Performance bond in the amount of 100% of project will be due 10 days before proejct start date. The contract will be awarded to the vendor who provides the most responsive proposal to Randall County base on the evaluation criteria set forth in the request for proposal documents. The Randall County Commissioner's Court reserves the right to reject any and/or all proposals. Payments will be made 30 days after receipt of invoice. The Youth Center project consists of the following work on approximately 1,300 sq ft of total: 1. Pod G i. Remove 12 dorm room doors. Reinstall existing hardware on new 14- gauge hollow metal doors. Hang doors and match paint to existing. ii. Remove and replace three 3' by 3' existing stainless steel showers. Remove and replace one 3' by 3' existing Handicap stainless steel shower. iii. Patch walls and flooring after installation. 2. Pod H i. Remove 12 dorm room doors. Reinstall existing hardware on new 14- gauge hollow metal doors. Hang doors and match paint to existing. ii. Remove and replace three 3' by 3' existing stainless steel showers. Remove and replace one 3' by 3' existing Handicap stainless steel shower. iii. Patch walls and flooring after installation. 3. Pod I i. Demo existing elevated Control Room. This shall include the detention grade glazing and metal window frames. (Existing detention grade doors, frames and hardware to be re-used) ii. Demo acoustical ceiling, and drywall fur downs, floor coverings, lighting, grilles & registers to prep for new wall configuration. This will accommodate increasing the Day Area requirement needed. iii. Frame new metal stud walls and add new wall and ceiling rough ins, sheetrock, paint new walls and existing dorm rooms with enamel paint. Increase acoustic ceiling height in the new day area, install epoxy with flake flooring at all form rooms and day areas. iv. Rework mechanical, electrical, plumbing and fire protection as needed. v. Remove one existing nonrated stainless steel shower unit and replace it with a handicap rated stainless steel shower unit.
Final Planning
Clubhouse / Community Centers
$430,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
13
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 4, 2025
April 6, 2026
9300 S Georgia St, Amarillo, TX
Related To This Project
Amarillo, TX
--
Amarillo, TX
Bid Date: Dec 03 2025
Amarillo, TX
Bid Date: Dec 02 2025
Amarillo, TX
Bid Date: Dec 04 2025
Amarillo, TX
Bid Date: Dec 16 2025
Amarillo, TX
--
Amarillo, TX
--
Amarillo, TX
--
Amarillo, TX
--
Amarillo, TX
Bid Date: Nov 13 2025
Amarillo, TX
--
RFQ Engineering - 2026-30 Prequalified Professional Engineering and Architectural Services - 5938361
Amarillo, TX
Bid Date: Dec 04 2025
Amarillo, TX
Bid Date: Nov 13 2025
Amarillo, TX
Bid Date: Dec 05 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
