BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 1, 2025 at 7:00 PM

Updated December 2, 2025

Site work and paving for a mixed-use development in Palm Springs, California. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The work on the Ramon Road Bridge at Whitewater River involves widening the bridge from a 4-lane arterial to a 6-lane arterial, with three lanes in each direction. The project includes seismic retrofitting, installation of new bridge barriers, bridge supports within the Whitewater River Channel, and the addition of a 5-foot sidewalk on the north side and a 10-foot-wide multipurpose trail with a physical barrier for bicyclists on the south side. The limits of roadway widening extend from San Luis Rey Drive to Landau Boulevard. Scope of work under this RFP includes comprehensive Construction Management services for the Ramon Road Bridge at Whitewater River Project. This includes developing project staging and traffic control plans, implementing a Quality Assurance Program (including materials testing and inspection), reviewing construction surveying, ensuring environmental compliance, and conducting public outreach. The selected firm will provide inspection services to ensure compliance with contract documents and environmental monitoring to meet CEQA and NEPA requirements, as well as all applicable environmental permits. The firm will also manage public engagement, including a project website, hotline, and community meetings. The selected firm will oversee material testing, ensure ADA compliance, coordinate with utilities, and manage all construction closeout services, such as final inspections and transitioning the project to City maintenance. All services must meet industry standards and applicable laws, including prevailing wage requirements. Question Deadline 11/17/2025 at 10:31 PM PT Online Q&A Yes Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Response Types Cost File Type of Award Lump Sum The method of Contractor Selection has not been Determined at this time.

Conceptual

Bridges / Tunnels

$500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
3
Bidding Soon
946
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2025

December 1, 2026

Project location map

Ramon Rd, Palm Springs, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.