Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 9, 2025 at 7:00 PM
Updated December 10, 2025
This is a service / maintenance or supply contract in Issaquah, Washington. Contact the soliciting agency for additional information.
The City of Issaquah, Washington invites qualified landscape architecture or park planning teams to submit a response to the Request for Qualifications ("RFQ") for managing, facilitating, and preparing the Tibbetts Valley Park ("TVP") Master Plan. This plan will set the framework for a master planning process for Tibbetts Valley Park, an existing 30-acre community park located on the western side of Issaquah. The goal of the consulting service(s) is to lead a Master Planning process with two distinct phases: Feasibility Study and Concept Plan Development. The first phase will be completing the Feasibility Study which will inform the baseline for the capabilities of the site to utilize during the master planning phase. The second phase will be the development of the Conceptual Plans and Master Plan Report. Community engagement will occur throughout both phases. The consultant is to provide expertise and professional services for analyzing, managing, facilitating, and developing both processes with the appropriate experts in each area. This information will support near and long-term visions for phasing and development of the park from both an environmental and recreational lens. Consultants are encouraged to present their own strategies and concepts to producing processes for both services. The Master Plan will establish a comprehensive framework that supports Issaquah's Creek to Peaks vision of multi-modal connectivity, the community's needs for year-round multi-use fields and courts, and the protection and enhancement of the park's natural systems. In addition to providing areas for active and passive recreation such as multi-use fields, all-inclusive playgrounds, courts, and trails, the plan will incorporate sustainable and resilient design principles that respect and strengthen the site's environmental context. Importance will be placed on preserving the creek and its riparian buffer through strategies such as green stormwater infrastructure, native and climate-appropriate plantings, and habitat enhancement measures. The city is also considering the use of renewable energy sources for site electrical needs including lighting, safety, and EV charging. Collectively, these elements will ensure the park functions as both a vibrant community asset and a model of environmental stewardship and resilience. These strategies align with the City of Issaquah's sustainability and climate action goals by advancing ecological protection, reducing greenhouse gas emissions, and promoting climate adaptation within public spaces. Culture, history, and education are elements that preserve and enhance the vibrancy of Issaquah and will be a component of the master plan. To support the Comprehensive Plan's Park Policy D1.5 we encourage consultants to integrate artistic components into the planning process that complement the design concept and fit the vision the community has for TVP. Questions and clarifications are due by November 17th, 5:00 pm. to allow for response time. The method of Contractor Selection has not been Determined at this time.
Conceptual
Playgrounds / Parks / Athletic Fields
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2026
965 12th Ave NW, Issaquah, WA
Related To This Project
Issaquah, WA
Bid Date: Jan 08 2026
Issaquah, WA
--
Issaquah, WA
--
Issaquah, WA
Bid Date: Jan 07 2026
Issaquah, WA
Bid Date: Feb 13 2026
Issaquah, WA
--
Issaquah, WA
Bid Date: Nov 19 2025
Issaquah, WA
Bid Date: Oct 22 2025
Issaquah, WA
--
Issaquah, WA
--
Issaquah, WA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
