Published December 19, 2025 at 7:00 PM

Updated December 20, 2025

Demolition and site work for a water / sewer project in Birmingham, Alabama. Completed plans call for the demolition of a 5,500-square-foot, one-story above grade water / sewer project.

Questions Concerning Meaning or Intent of Bidding Documents Shall Be Submitted to Tad Powell, Pe, Senior Associate, Hazen, and Sawyer, at Email Tpowell@hazenandsawyer.com No Later Than 5:00 P.m. Local Time on Thursday, December 11th, 2025. The scope of work includes the rehabilitation and replacement of a pump station in Jefferson County. The work involves demolition of the existing pump station, including, but not limited to, pumps, piping, building structure, and electrical components. Installation includes an 8-foot by 6-foot precast concrete bypass structure with cast-in-place concrete base, stainless steel weir assembly, and monolithic liner. Improvements and conversion of existing wet well and dry pit into an auxiliary overflow storage structure. Installation of approximately 60 linear feet of 24-inch new sanitary sewer pipe. Installation of two 60-inch diameter precast concrete sewer manholes. Installation of one 12-foot by 12-foot precast concrete wet well with monolithic liner. Installation of four submersible pumps with all controls, piping, valves, fittings, and appurtenances. Installation of one 16-foot by 8-foot precast concrete valve vault. Installation of one 60-inch diameter precast concrete manhole with magnetic flow meter. Installation of one elevated generator building with exterior platform and natural-gas-powered backup generator and electrical equipment and pump station electrical components. Removal, relocation, and installation of electrical riser poles, transformers, and overhead lines. New Spire gas service and relocations. Site improvements, including gates, fencing, concrete paving, concrete pump station pad, lighting, and restoration work. Pre-qualification requirements: Bids will only be accepted from pre-qualified contractors who are listed on the plan holders list, signifying that they have purchased a set of documents from the Engineer, and who attend the mandatory pre-bid conference. Contractors must be pre-qualified with the Jefferson County Environmental Services Department to bid Class D Pump Station and Package Plant Facilities Projects and must furnish written evidence of competency and financial responsibility. Pre-qualifications will not be accepted after the stated deadline. A form containing the contractor's name, address of the firm, and Alabama license number with the date of expiration is required with submission of the bid. These requirements shall not be waived.

Bid Results

Water / Sewer

$4,976,076.00

Public - County

Demolition, Site Work

52

25

10

7

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
42
Bidding Soon
584
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2025

April 20, 2026

Project location map

2901 Huntsville Rd, Birmingham, AL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.