BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 10, 2025 at 7:00 PM

Updated December 11, 2025

Renovation of an educational facility in Norwalk, Connecticut. Completed plans call for the renovation of a educational facility.

**As of December 09, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The City of Norwalk is soliciting Bids from qualified General or Specialty Contractors to remove, replace and upgrade all of the existing hallway lockers at Nathan Hale and Ponus Ridge Middle School. All on-site work is to be performed and completed during Summer 2026 when school is out of session. The requirements of this project are outlined in greater detail under Section 2 Scope of Work/Project Specifications. Location Nathan Hale Middle School, 176 Strawberry Hill Ave., Norwalk, CT proceed to Ponus Ridge Middle School, 21 Hunters Ln., Norwalk, CT Question Deadline 11/14/2025 at 2:00 PM ET All questions concerning this solicitation must be directed, via e-mail, to Carleen Megaro, Buyer at cmegaro@norwalkct.gov The selected Contractor shall be responsible for: Dismantling, removing and disposing of all existing hallway lockers. Sourcing and supplying new lockers, hardware and accessories as specified in this Document. Installation of new hallway lockers in factory-finished condition. Field testing and adjustment of installed lockers to ensure proper functioning. Provisioning of all necessary documentation as specified in this Invitation to Bid. The selected Contractor and any Subcontractors must have sufficient staff to assure that staff is and will be available to handle the project to assure task continuity, prompt delivery of services and completion of assigned tasks. The selected Contractor must be able to begin work on the project immediately upon notification. The selected Contractor must assign a designated Project Manager to be responsible for the management of the project. The Contractor and any Subcontractors shall always conduct themselves and perform its duties in the manner of and with the expertise of an experienced construction professional. All services shall be performed in adherence to, and deliverables comply with, applicable federal, state, and local building codes, laws, regulations, standards, and requirements. It is also understood that the selected Contractor will be required to complete all direct and indirect responsibilities associated with all assigned tasks such that the intent, and desired goal of Norwalk Public Schools, can be achieved. Ponus Ridge Middle School 1. Standard metal wardrobe lockers surfaced mounted with sloped tops. Approximate count of 99, two tier. Filler pieces will apply, therefore, new units must be verified in field. 2. Standard metal wardrobe lockers recessed mounted flush with walls at existing locations. Approximate count of 452, two tier. Filler pieces will apply, therefore, new units must be verified in field. 3. The intent is to match what fits the existing space with newly frame dimensions. The approximated counts are just that, approximations based on initial rough measurements of the available space. 4. The City requires five (5) percent of total number of lockers be accessible. Nathan Hale Middle School 1. Standard metal wardrobe lockers surfaced mounted with sloped tops. Approximate count of 422, single tier. Filler pieces will apply, therefore, new units must be verified in field. 2. Standard metal wardrobe lockers recessed mounted flush with walls at existing locations. Approximate count of 280, single tier. Filler pieces will apply, therefore, new units must be verified in field. 3. The intent is to match what fits the existing space with newly frame dimensions. The approximated counts are just that, approximations based on initial rough measurements of the available space. 4. The City requires five (5) percent of total number of lockers be accessible. B. Related Sections include the following: 1. Miscellaneous rough carpentry for any necessary concealed wood support base, furring, blocking, and shims required for installing m The requirements of this project are outlined in greater detail under Section 2 Scope of Work/Project Specifications. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Educational

$460,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
782
Active Projects
158
Bidding Soon
6,875
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.