BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2025 at 7:00 PM

Updated December 3, 2025

Site work and paving for a civil project in Columbus, Nebraska. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

**As of December 2nd, 2025, the project was awarded to Gehring Construction & Ready-Mix with an awarded amount of $1,897,618.10.** Concrete Paving Improvements 2026 SCOPE OF WORK This work covered by this Article 4 of the specifications consists of furnishing all labor, equipment, supplies and materials, and in performing all operations in connection with the preparation of subgrade as required and in performing all operations in the connection with the construction of air-entrained Portland cement concrete pavement. The following recognized standards [State of Nebraska, Department of Roads 2007 Standard Specifications for Highway Construction (NDOR), the American Water Works Association Standards (AWWA), American Standards for Testing and Materials (ASTM), American Association of State Highway and Transportation Officials (AASHTO), etc., or the latest revisions thereof] shall apply except as hereinafter provided. All specifications included in this Article 4 will pertain except that special notations on the plans, in the "Special Provisions", or in the "General Provisions", shall have precedence. 4.2 SITE PREPARATION 4.2.1 CONCRETE SAWING The Contractor shall exercise due care in breaking concrete to be removed and shall be responsible for any damage caused by such breaking and removal. In removing existing pavement, sidewalks, driveways, and similar items where a portion of such items is to be left in place, the removal shall be extended to the limits shown on the plans or to an existing joint as directed by the City Engineer. In the event the City Engineer does not consider it practical to extend the limit of removal to an existing joint, the line of removal shall be scored with a concrete saw to a depth of at least two (2) inches prior to breaking out the concrete. When the contract contemplates placing an asphaltic concrete surface, sawing may be omitted. In any event, connecting edges shall be cut and chipped to true vertical faces.CLEARING AND GRUBBING Except for the trees, shrubs, and grasses which are to be preserved as indicated on the plans or as designated by the City Engineer, all trees, stumps, hedges, shrubs, weeds, grasses, other herbaceous vegetation, and rubbish shall be removed from the right-of-way and from borrow pits furnished by the contracting authority. This work shall be classified as follows: 1) Clearing shall consist of the cutting, removal, and disposal of trees six (6) inches or less in diameter. 2) Grubbing shall consist of the removal and disposal of stumps, including roots. 3) Weed and rubbish removal shall consist of the removal and disposal of all weeds, grasses, other herbaceous vegetation, and all rubbish 4.2.3 REMOVAL OF PAVEMENT This item shall consist of the removal and disposal of plain and reinforced concrete, brick, stone, block, asphalt and shall include base, surface, and cushion courses, if any regardless of the material or materials encountered. Removals include all sidewalks, curb and gutter, curbs, slabs, driveways, streets, and so forth REMOVAL OF CONCRETE HEADER This item shall consist of removing and disposing of the concrete portion of concrete headers previously placed at the open ends of existing pavement, at the locations indicated on the plans, or as required by the City Engineer. Reinforcing bars shall remain in place.

Award

Roads / Highways

$1,897,618.00

Public - City

Paving, Site Work

38

10

14

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
92
Bidding Soon
821
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 25, 2025

May 25, 2026

Project location map

Multiple Locations, Columbus, NE


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.