Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 13, 2025 at 7:00 PM
Updated November 14, 2025
Renovation of an educational facility in Sutton, Alaska. Working plans call for the renovation of a educational facility.
** As of November 13, 2025 project is cancelled. No definite date for rebid. ** The Matanuska-Susitna Borough is requesting bids from qualified mechanical contractors to provide boiler improvements to Sutton Elementary School. For more information call (907) 861-8601 or e-mail purchasing@matsugov.us. Question Deadline 11/10/2025 at 5:00 PM AKT Questions will be received at online. Questions or requests for clarifications shall be directed to the Boroughs Purchasing Officer at purchasing@matsugov.us. The Base Bid includes replacement of three (3) circulation pumps, installation of one new three-way valve, and upgrading the existing pneumatic Three way valve to Siemens DDC controls, including all associated temperature controls and components required for monitoring, temperature, pressure, operating, and alarms set points for each item. Work also includes all miscellaneous parts, fittings, wiring, and accessories required for a complete and operational boiler system improvement. One Additive Alternate is included: 1. Replace the existing day tank with a new unit matching the specifications of the existing system. 1.01 General A. The contractor shall provide all labor, supervision, equipment, materials, shipping, and incidentals required to furnish and install all new components necessary to complete the boiler control system upgrade. The contractor is responsible for verifying existing conditions, making all necessary connections, complying with applicable codes, and obtaining all required permits and inspections from the authorities having jurisdiction over commercial plumbing and mechanical work in the State of Alaska. D. The contractor shall also be responsible for the proper and safe removal and disposal of all existing pumps, valves, controls, waste, debris, and excess materials. MSBSD shall be offered the first right of refusal for any usable parts removed prior to disposal. E. The contractor shall coordinate all required utility shutdowns with MSBSD. F. Project Location: 11672 Wright Way, Sutton-Alpine, AK 99674 G. Electronic (PDF) copy of submittals will be delivered to the Borough Project Manager for approval. H. The contractor shall provide a detailed project schedule and schedule of values prior to the PreConstruction Meeting. I. Payment applications shall be based on the approved schedule of values and submitted no more than once per month. J. Commissioning of the upgraded DDC controls, new circulation pumps, and hydronic system balancing for optimal operation shall be completed and documented prior to contract expiration. A commissioning report shall be submitted to the Borough Project Manager and MSBSD Facilities Maintenance. DDC system shall replace the existing pneumatic controls and fully integrate with Siemens control monitoring network for any item replaced that is currently controlled by pneumatics. The Matanuska-Susitna Borough reserves the right to accept or reject any or all bids, waive any and all technicalities or informalities it deems appropriate. Award of this project is subject to the availability of funding. Project has been cancelled
Final Planning
Educational
$1,000,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 19, 2025
May 13, 2026
11672 Wright Way, Sutton, AK
Related To This Project
Sutton, AK
--
Sutton, AK
Bid Date: Jan 24 2025
Sutton, AK
Bid Date: Sep 11 2025
Sutton, AK
Bid Date: Oct 30 2024
Sutton, AK
Bid Date: Aug 12 2024
Sutton, AK
Bid Date: Aug 14 2024
Sutton, AK
--
Sutton, AK
--
Sutton, AK
Bid Date: Jun 03 2022
Sutton, AK
Bid Date: Aug 30 2021
Sutton, AK
Bid Date: Jan 22 2021
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.