BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2025 at 7:00 PM

Updated December 9, 2025

Site work and paving for a mixed-use development in Bedford Township, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

0.49 mi of a roundabout construction including hot mix base crushing, shaping and resurfacing, concrete curb and gutter and pavement markings on Smith Road at Jackman Road, Monroe County. This is a Local Agency project. 0% Dbe Participation Required Net classification required for this project is 1775 Cb or Comb/Jt. 1775 Ea, K In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea and K. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No CPMG 58000 215228A 25A1066 Completion Date: 10/16/2026 MIDOT - 2512 019 - Roundabout Construction Including Hot Mix Base Crushing, Shaping and Resurfacing, Concrete Curb and Gutter and Pavement Markings on Smith Road at Jackman Road Letting Number: 251205 PN - 451-002-209078

Bid Results

Roads / Highways

$1,526,965.00

Public - State/Provincial

Paving, Site Work

67

5

6

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
1
Bidding Soon
1,450
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2025

February 3, 2026

Project location map

Jackman Rd & Smith Rd, Bedford Township, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.