BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2025 at 7:00 PM

Updated November 13, 2025

Remodeling of an elderly care / assisted living facility in King, Wisconsin. Completed plans call for the remodel of a one-story above grade elderly care / assisted living facility.

Flooring installation services are requested for the removal and disposal of existing 12x12 vinyl square tile and installation of new LVT and vinyl base flooring on the second and fourth floors of Ainsworth Hall. The work also includes removal of the current mop boards attached to the walls in contact with the flooring and replacement with new mop boards. All flooring and mop boards will be provided by the Wisconsin Veterans Home at King; the contractor is responsible for providing minimal installation materials such as adhesives. The new flooring and base have already been purchased and are stored on-site. Question Deadline 12/05/2025 at 1:00 PM CT Email is also accepted for the submission of questions and/or clarifications and must refer to Request for Bid # VA261138 and be directed to Erin Schmitz at Erin.Schmitz@wisconsin.gov. The WVH-K is a 721-bed skilled nursing facility spanning 42-acres and consists of multiple buildings. Flooring installation services, which will include the removal and disposal of the existing 12x12 vinyl square tile and installation of the new "Armstrong Natural Creations" LVT and vinyl base flooring for Ainsworth Hall on the second (2nd) and fourth (4th) floors. The fourth (4th) floor will be completed firstfollowed by the second (2nd) floor. Service will also include the removal of the current mop boards attached to the walls that come into contact with the flooring, and replacement with new mop boards. WDVA will provide all flooring and mop boards needed for installation. The Contractor will be responsible for providing minimal materials to complete installation, such as flooring adhesives. WVH-K has already purchased the vinyl base and LVT flooring which is currently being stored on-site. WDVA will be responsible for relocating any existing furniture and cabinetry prior to the flooring replacement, and reinstalling when the flooring installation is complete.

Sub-Bidding

Elderly Care / Assisted Living

$200,000.00

Public - State/Provincial

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
31
Bidding Soon
622
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2026

February 5, 2026

Project location map

N2665 County Rd QQ, King, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.