Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 14, 2025 at 7:00 PM
Updated December 9, 2025
This is a service / maintenance or supply contract in Tucson, Arizona. Contact the soliciting agency for additional information.
The City of Tucson is seeking up to five contractors to provide annual well drilling services. Background Job Order Contracting is an alternative delivery method for construction of public works projects. JOC's differ from the standard project-specific, low bid contracts in that they are indefinite-quantity contracts, which can be awarded on the basis of qualifications. Best value may be considered in awarding the JOC or in awarding job orders under the JOC contract. Each individual job order contract will establish its own individual project limit. Mayor and Council have approved ordinance 12175 which states that individual projects may not exceed $5,000,000 unless the Mayor and Council approves a higher limit for that project. Question Submission Deadline: December 2, 2025, 2:00pm QUESTIONS SHALL BE DIRECTED TO: Sonya Lazo (520) 837-4473 sonya.lazo@tucsonaz.gov The term of this contract will be one (1) year with four (4) additional one-year periods. Services will be requested on an as-needed, if-needed basis and the resultant contract is neither exclusive nor a commitment by the City that the Contractor's services will be required. PRE-SUBMITTAL MEETING: Dial in by phone +1 213-293-2303,,180881369# United States, Los Angeles Find a local number Phone conference ID: 180 881 369# Scope of Required Services Contractor shall provide well drilling, installation, sampling services, aquifer/pump testing services, maintenance, pump removal/repair, color calibrated well video logging, general well operations/maintenance, aquifer assessment, and well abandonment services in the Tucson area. Work performed under this contract will be on an as needed/if needed basis. The specifications for individual projects will be generated based on site specific conditions in a request for bid (RFB). Groundwater extraction and production wells Installed for the City of Tucson generally range from five hundred (500) to twelve hundred (1200) feet deep but specific depths will depend on the site. The well construction materials may include stainless steel, low carbon steel and/or schedule 80 PVC. Tucson Water may elect to purchase the casing directly from the manufacturer or may request the Contractor purchase the casing. The regional groundwater table in the Tucson area varies greatly and can be encountered at depths ranging from approximately 75 to over 600 feet below surface grade. The types of soil beneath the sites include gravels, sands, silts and clays. Logs are available upon request at the City of Tucson, Tucson Water. COT invites drilling contractors who use one or more of the drilling methods described below to submit their qualifications.
Post-Bid
Water / Sewer
$8,000,000.00
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
