Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published January 17, 2026 at 7:00 PM
Updated January 18, 2026
Site work and renovation of a civil project in Everglades City, Florida. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Rehabilitation of existing Chokoloskee Master Pump Station Chokoloskee Master Pump Station Rehabilitation . Questions must be received no later than December 2, 2025 at 5:00 P.M. Local Time. All bidder questions shall be emailed to Tammie Pernas at accounting@cityofeverglades.org and Katherine Rivera at krivera@cphcorp.com, A. The project consists of the full rehabilitation of one (1) lift station located in Chokoloskee Island off Smallwood Drive. The work includes, but is not limited to, repurposing the existing wet well, replacing internal pumps/fittings/valves/piping, replacing all electrical components, demolishing the outdated wet well and valve vaults, and site restoration as necessary with all associated work required for a complete project in accordance with the contract documents. B. All work activities shall be required to be in accordance with the permits issued by the respective agencies. All work performed will be required to be done while maintaining the functional operation of the existing Park. C. All materials, equipment, skills, tools, and labor which is reasonably and properly inferable and necessary for the proper completion of the Work and in compliance with the requirements stated or implied by these Specifications or Drawings shall be furnished and installed by the CONTRACTOR without additional compensation, whether specifically indicated in the Contract Documents or not. D. The City of Everglades City Engineering Standards Manual (Latest Edition) is incorporated by reference into these specifications. Contractor shall be aware that adherence to Standards in the Manual and as described herein shall be required. Should there be any conflicting information between these two documents, then the more stringent Standard shall be utilized. E. Repair, replace, or otherwise settle with the OWNER or OWNER'S Representative, if damage to property or existing facilities occurs, including damage to pavements, buildings, utilities, structures, etc. F. Construct the Project under a Lump Sum Contract. G. The CONTRACTOR shall perform the work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, clean up, replacement
Award
Water / Sewer
$681,800.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
