BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2025 at 7:00 PM

Updated December 5, 2025

Renovation of an office development in Logan, Utah. Completed plans call for the renovation of a one-story above grade office development.

Replacement of existing, outdated fire alarm system. Only invited contractors listed are allowed to attend the mandatory meeting. All prime contractors wishing to bid must attend and sign in; contractors not in attendance are ineligible to bid. Subcontractors and suppliers are invited to attend but attendance is not mandatory. During the mandatory meeting, a presentation will be made describing the overall scope of work and intended project schedule, and interested contractors may ask questions and request clarification about the project and procurement process. All project-related requests for information, clarifications, and questions must be submitted via the designated website by the specified deadline. Product substitutions may be proposed if they meet or exceed the standards in the drawings and specifications and are compatible with the intent and purpose of the design, subject to written approval prior to the deadline for the final addendum. This section of the specifications includes the complete demolition of existing fire alarm system and furnishing, installation, connection and testing of new microprocessor controlled, intelligent reporting fire alarm equipment required to form a complete, operative, coordinated system to protect the Division of Workforce Services Building located at 180 North 100 West in Logan, UT Fire alarm system shall include, but not be limited to, alarm initiating devices, alarm notification appliances, Fire Alarm Control Panel (FACP), remote power supplies, auxiliary control devices and relays, annunciators, conduit and wiring as shown on the drawings and specified herein Question Deadline 11/21/2025 at 3:00 PM MT Online - Q&A This section of the specifications includes the complete demolition of existing fire alarm system and furnishing, installation, connection and testing of new microprocessor controlled, intelligent reporting fire alarm equipment required to form a complete, operative, coordinated system to protect the Division of Workforce Services Building located at 180 North 100 West in Logan, UT Fire alarm system shall include, but not be limited to, alarm initiating devices, alarm notification appliances, Fire Alarm Control Panel (FACP), remote power supplies, auxiliary control devices and relays, annunciators, conduit and wiring as shown on the drawings and specified herein.

Post-Bid

Office

$80,000.00

Public - State/Provincial

Renovation

10

9

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
47
Bidding Soon
660
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2025

January 5, 2026

Project location map

180 N 100 W, Logan, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.