Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 13, 2026 at 7:00 PM
Updated January 14, 2026
Site work for a water / sewer project in Douglas, Wyoming. Completed plans call for site work for a water / sewer project.
**As of January 13th, 2026, the project was awarded to WyoDak Energy Services, LLC, with an awarded amount of $1,071,337.51** Question Deadline 12/05/2025 All questions about the meaning or intent of the Contract Documents shall be submitted to ENGINEER in writing. Questions received less than five (5) days prior to the date for opening the Bids will not be answered. The project generally consists of replacing the aging water mains in S. 2nd and S. 3rd Streets between Oak and Elm Street in addition to the sanitary sewer replacement in the alley connecting N. 3rd Street to N. 4th Street directly behind the businesses on the north side of Center Street between 3rd and 4th Streets. The project includes approximately 600 linear feet of 8-inch DR18 C900 PVC water main including ductile iron fittings, hydrants, and water services to and through the curb stop. It also includes 645 linear feet of 8-inch SDR35 PVC sanitary sewer main and manholes. The project will include an asphalt trench patch and some concrete repair. Site Directions: Take exit 140 from I-25 into Douglas and continue on the off ramp the intersection of Hwy 59 and W. Yellowstone Hwy. Continue through the lights onto W. Yellowstone Hwy for approximately 1.2 miles. Then turn right onto S. 2nd Street on continue to the intersection of Oak and S. 2nd Street. The first half of the project is bound by Oak Street and Elm Street on S. 2nd and S. 3rd Street. The second half of the project is also located on the north side of Center Street between N. 4th and N. 3rd Street in the alley behind the Budget Newspaper Building.
Award
Water / Sewer
$1,071,338.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 10, 2025
February 9, 2026
Multiple Locations, Douglas, WY
Related To This Project
Douglas, WY
Bid Date: Dec 03 2025
Douglas, WY
Bid Date: Dec 16 2025
Douglas, WY
Bid Date: Dec 10 2025
Douglas, WY
Bid Date: Jan 28 2026
Douglas, WY
Bid Date: Feb 12 2026
Douglas, WY
Bid Date: Dec 04 2025
Douglas, WY
Bid Date: Jan 13 2026
Douglas, WY
Bid Date: Nov 25 2025
Douglas, WY
--
Douglas, WY
--
Douglas, WY
--
Douglas, WY
--
Douglas, WY
Bid Date: Nov 12 2025
Douglas, WY
Bid Date: Nov 05 2025
Unlock Your Potential with Access to Commercial Construction Data
Sign up now to get free company and project data. No payment required.
