Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 16, 2025 at 7:00 PM
Updated December 17, 2025
Renovation of a residential development in Mobile, Alabama. Completed plans call for the renovation of a residential development.
o Pictures must be provided to include material delivery, through each step, to housing inspector during repair. Pictures must be clear, and referenced to home being worked on. Pictures are to be provided in real time, prior to home being completed. Third party apps such as Company Cam(R) are acceptable. o Areas that are found to be spaced decked shall be covered with 1/2 " exterior grade sheathing material after removing the existing decking. It is the contractors responsibility to ensure the framing and structure will support the additional load. o Remove existing roofing materials down to bare decking. o Check all roof trusses/rafters and repair/replace as needed to ensure that new roof structure is flat and smooth without rises or depressions in roof system. o Replace all rotten, broken, un-even, weak, or deteriorated decking framing; including supporting roofing system such as rafter tails, facia and etc. o Any exposed repaired or replace wood should be protected from the elements, painted to match existing color. o Replaced/repaired decking shall be level and ready to accept felt and shingles. o Check all roof trusses for strength and stability before re-shingling house. o Remove all unused elements, vents, etc., that are not operational and close them below roof level. o Re-flash all valleys, vents, roof openings, and chimneys. o Install new boots around all roof penetrations. o Haul away debris immediately. o Use a magnetic sweep around the perimeter of house and rake away any other debris. o Cover entire roof decking with self-adhered roofing underlayment then install synthetic or 15# asphalt impregnated felt underlayment. o Prepare roof decking to accept a ridge vent. o Starter shingles must be self-adhered. o Re-roof with a 30year dimensional class A fiberglass asphalt shingle. (Owners choice of color) (any area deemed to need roll roofing material will be self adhering modified bitumen) cap sheet and (base sheet if needed) install proper metal drip rail for this style roofing. o Contractor must provide shingle color sample to homeowner prior to material delivery. o Shingles must be 1st quality still in the wrapper. Seconds will not be accepted. o Install drip rail around perimeter of house. Shingles shall have 1/2 " to 1 1/2 " overhang. o Install roof over ridge vent with-in 2ft of end of ridge (end to end). o New roof shall be structurally sound and leak free, including at any attached structures that are adjoined to roof. o Contractor shall warrant the roof to be completely leak free for one year. If you have any questions, you can call Ginny Kirby at 251-208-6297. Please make sure to accommodate homeowners and be considerate of their time and families. Any complaints received will be considered and may result in a bid not being awarded to a particular contractor. ** Appointments are encouraged and preferred. ***Bid Documents, Plans and Specs are for viewing purposes only. If you wish you bid you must obtain them directly from to be a registered plan holder to place a bid.
Award
Residential Subdivision
$8,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 24, 2025
December 24, 2025
404 S Jefferson St, Mobile, AL
Related To This Project
Mobile, AL
Bid Date: Nov 24 2025
Mobile, AL
Bid Date: Nov 24 2025
Mobile, AL
Bid Date: Dec 04 2025
Mobile, AL
Bid Date: Dec 03 2025
Mobile, AL
Bid Date: Dec 10 2025
Mobile, AL
Bid Date: Nov 19 2025
Mobile, AL
Bid Date: Nov 26 2025
Mobile, AL
Bid Date: Dec 04 2025
Mobile, AL
Bid Date: Nov 24 2025
Mobile, AL
Bid Date: Nov 24 2025
Mobile, AL
Bid Date: Nov 24 2025
Mobile, AL
Bid Date: Nov 24 2025
Mobile, AL
Bid Date: Nov 24 2025
Mobile, AL
Bid Date: Dec 01 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
