BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 29, 2025 at 7:00 PM

Updated December 30, 2025

Renovation of a municipal facility in Rock Island, Illinois. Completed plans call for the renovation of a municipal facility.

As of December 29, 2025, project was awarded to White Roofing Management Group, LLC for $18,450.00. Invitation to bid roof replacement and insulation. This owner-occupied property will be undergoing rehabilitation using Housing and Urban Development (HUD) funds to ameliorate deteriorating and deteriorated conditions. All work shall be subject to HUD 35.930 and Environmental Protection Agency (EPA) regulations. The bidder shall submit a project plan using the design standards below that is in compliance with all applicable HUD, EPA, and State of Illinois regulations as well as all local building and zoning codes. The plan must include a clear project timeline and budget with line item costs. The contractor shall act as the general contractor for the project using subcontractors as required. Subcontractors that will be required should be clearly identified in the project plan. Remove the chimney from the roof down below the roof line. The attic is a walk-in so make sure to leave the existing chimney intact below the roof line with no debris left on the floor or loose brick that could be falling hazards. Making sure that there is a liner that pulls the flue gases from the basement out through the roof. Install new galvanized pipe, flashing, storm collar, and weather cap. Some framing maybe needed along with sheathing covering the old area from the existing chimney. Remove existing shingles from the roof down to the roof sheathing. Check for excessively wide gaps in the roof planking. Install that Ice and snow guard in all of the valleys and lower edges of the roof line. This must cover 2' higher than the exterior plate line. Approved water barrier over the remain roof sheathing. Install new 2' style D roof edging throughout. Install 35-year architectural shingles of the homeowner's choice. Install a shingle over ridge vent following manufacture's instruction. Allow maximum cut back of the ridge line for ventilation. Install new plumbing flashing boots, extend the plumbing vents if less the 12" on the shallow side. Patch all the turtle vent holes with approved sheathing material. Clean all the gutters out after the roof is completed. Install insulation along the box sill using R-19 kraft faced through the entire basement. They must fasten to the sides of joist pockets using staples fill the entire pockets tightly. Building permit is required before work begins. All questions shall be directed to the Construction Officer at 309-732-2906.

Award

Municipal

$18,450.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
59
Bidding Soon
1,133
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2025

January 6, 2026

Project location map

1516 33rd St, Rock Island, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.