BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 15, 2026 at 7:00 PM

Updated January 16, 2026

Site work and renovation of an educational facility in Pickens, South Carolina. Working plans call for the renovation of a educational facility; and for site work for a educational facility.

**As of January 15, 2026, the project is canceled. No definite date for the rebid.** The School District of Pickens County (hereinafter "the District") is soliciting proposals from qualified firms to furnish and install four (4)outdoor LED baseball and four (4)softball scoreboards at the District's four high schools. Pre-Bid Information: NA Question Deadline 11/20/2025 at 10:00 PM ET Question Deadline 11/20/2025 at 10:00 PM ET Question sent to Julie Hunter Phone (864) 397-1035 E-Mail Address juliehunter@pickens.k12.sc.us SCOPE OF WORK The School District of Pickens County (hereinafter “the District”) is soliciting proposals from qualified firms to furnish and install four (4)outdoor LED baseball and four (4)softball scoreboards at the District’s four high schools. The completed system shall provide clear, accurate, and dependable game information for players, coaches, and spectators. The successful contractor shall provide all labor, materials, equipment, engineering, and supervision necessary for a complete, turn-key installation that meets or exceeds the requirements described below. The specifications are general requirements and not intended to exclude a proposal as the District desires vendors to put forth their best proposal. The District requires installation at all four high schools to be completed by February 9, 2026. Please specify in your bid if you cannot meet this requirement with a proposed date. EMAILED BIDS ARE NOT ACCEPTED Click here for Softball Scoreboard Specifications: Click here for Baseball Scoreboard Specifications: Softball Scoreboard Specifications Baseball Scoreboard Specifications A. GENERAL SPECIFICATIONS: 1. The company must include the design, delivery and installation of all proposed products in the proposal. 2. The company must oversee any and all aspects of the project including working with any subcontractors. 3. The company must be able to complete installation at all four high schools by February 9, 2025. If this cannot be done during this time, please let us know the time frame for installation. 4. The Firm must keep the work site and surrounding areas free from accumulation of waste materials or rubbish caused by operations from the installation of materials. 5. The successful Firm must submit the brand, make and model of all equipment to The School District of Pickens County for approval prior to installation.

Final Planning

Educational

$300,000.00

Public - County

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
1
Bidding Soon
730
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2025

July 15, 2026

Project location map

Multiple Locations, Pickens, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.