BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2026 at 7:00 PM

Updated January 8, 2026

Renovation of an educational facility in Columbia, Missouri. Completed plans call for the renovation of a one-story above grade educational facility.

The Columbia School District is soliciting proposals for the replacement and installation of a gymnasium video scoreboard system at Battle High School. This project is the first phase of a multi-year initiative that may include the replacement and installation of similar systems at two additional high schools in future phases. Bidders are required to visit the site, familiarize themselves with the conditions, understand actual quantities to be installed, and gather all necessary information to complete the project in its entirety. A mandatory pre-bid walk down will be held, and interested contractors must attend at Battle High School. Only electronic bid submissions will be considered. Bidders must bring a government-issued ID to enter district buildings. SCOPE OF WORK The scope of work for Battle High Gymnasium Video Scoreboard Replacement shall include, but is not limited to, the following: Provide equipment, material, and labor to install. The awarded vendor will provide a complete, turn-key solution including equipment, removal of existing systems, installation, training, and ongoing support. Battle High is the first in a multi-year project that may include two additional high schools in subsequent phases. Additional phases will require cooperative contract pricing and separate board approval. Includes (but is not limited to): 1. Removal & Disposal a. Safely remove and dispose of existing scoreboard and associated components in accordance with local regulations and District guidelines. 2. New Video Scoreboard System a. Furnish and install a complete LED video scoreboard display system appropriate for indoor gymnasium use. b. Minimum resolution of 3.9 mm pixel pitch (or better) is preferred. c. Systems shall include scoreboard functionality (score/time/period/fouls), media playback (video, animation, logos), and advertising capability. d. Must include all supporting components (controller, mounting structure, cabling, etc.). 3. Shot Clocks and Auxiliary Displays a. Include Alternate Pricing to provide and install integrated shot clocks with game timersynchronization. b. Include any additional auxiliary scoreboards or display panels as needed to ensure full visibility from all court areas. 4. Control Software & Hardware a. Furnish an intuitive, user-friendly operating system with control console and interface for scoreboard and video content. For inquiries or questions about the bid or specifications, please contact the following: Bid procedures and format Ms. Dana Reynolds, Purchasing Agent Email: dreynolds@cpsk12.org Question Deadline 12/05/2025 at 12:00 PM CT

Post-Bid

Educational

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
0
Bidding Soon
494
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

June 8, 2026

Project location map

7575 E St Charles Rd, Columbia, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.