Site work for a power facility in Parsons, Kansas. Completed plans call for site work for a one-story above grade power facility.

Laundry to Power Plant Replace Steam and Condensate Lines - PSH. The project is classified as engineering with a budget of $275,000, and is located in Labette County. The estimated value is between $250,000 and $500,000. The general project scope of work consists of the following. Reference plan sheets and specifications for full requirements. 1. Existing Conditions: a. High pressure steam originating at the campus power plant serves the laundry building. b. Existing below grade condensate piping feeding the laundry has failed and needs replacement. 2. Project Requirements: a. Provide new below grade pre-insulated piping systems feeding the laundry. b. Provide new concrete vaults. c. Provide new condensate return pump for laundry building. Alternate Bid Items: 1. Alternate definition: An amount proposed by bidders and sated on the Bid Form for certain work defined in the Bidding Requirements that may be added to or deducted from the base bid amount if Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents. a. Alternates described in this Section are part of the Work only if enumerated in the Agreement. b. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum. 2. Alternate No. 1 a. Provide all work related to providing a new below grade, pre-insulated, high pressure steam piping system. The BASE BID for the project will include all condensate return piping, condensate return pump, and both concrete vaults. Completion- 135 Calendar days Question Deadline 11/28/2025 Requests for clarifications and interpretations of the Construction Contract Documents (Technical Specifications and Drawings) shall be presented to the Project Architect/Engineer in writing at least ten (10) days prior to the date on which bids are to be opened.

Sub-Bidding

Power Plant

$500,000.00

Public - State/Provincial

Site Work

16

10

4

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
68
Bidding Soon
617
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2025

January 12, 2026

Project location map

2601 Gabriel Ave, Parsons, KS


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.