Site work for a power facility in Parsons, Kansas. Completed plans call for site work for a one-story above grade power facility.
Laundry to Power Plant Replace Steam and Condensate Lines - PSH. The project is classified as engineering with a budget of $275,000, and is located in Labette County. The estimated value is between $250,000 and $500,000. The general project scope of work consists of the following. Reference plan sheets and specifications for full requirements. 1. Existing Conditions: a. High pressure steam originating at the campus power plant serves the laundry building. b. Existing below grade condensate piping feeding the laundry has failed and needs replacement. 2. Project Requirements: a. Provide new below grade pre-insulated piping systems feeding the laundry. b. Provide new concrete vaults. c. Provide new condensate return pump for laundry building. Alternate Bid Items: 1. Alternate definition: An amount proposed by bidders and sated on the Bid Form for certain work defined in the Bidding Requirements that may be added to or deducted from the base bid amount if Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents. a. Alternates described in this Section are part of the Work only if enumerated in the Agreement. b. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum. 2. Alternate No. 1 a. Provide all work related to providing a new below grade, pre-insulated, high pressure steam piping system. The BASE BID for the project will include all condensate return piping, condensate return pump, and both concrete vaults. Completion- 135 Calendar days Question Deadline 11/28/2025 Requests for clarifications and interpretations of the Construction Contract Documents (Technical Specifications and Drawings) shall be presented to the Project Architect/Engineer in writing at least ten (10) days prior to the date on which bids are to be opened.
Sub-Bidding
Power Plant
$500,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2025
January 12, 2026
2601 Gabriel Ave, Parsons, KS
Related To This Project
Parsons, KS
Bid Date: Dec 10 2025
Parsons, KS
Bid Date: Dec 09 2025
Parsons, KS
Bid Date: Sep 30 2025
Parsons, KS
Bid Date: Oct 21 2025
Parsons, KS
Bid Date: Sep 17 2025
Parsons, KS
Bid Date: Jul 11 2025
Parsons, KS
Bid Date: Jun 12 2025
Parsons, KS
Bid Date: Aug 14 2025
Parsons, KS
Bid Date: Mar 27 2025
Parsons, KS
Bid Date: Feb 24 2025
Parsons, KS
Bid Date: Mar 11 2025
Parsons, KS
Bid Date: Feb 20 2025
Parsons, KS
Bid Date: Feb 20 2025
Parsons, KS
Bid Date: Mar 13 2025
Parsons, KS
Bid Date: Jan 22 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.