Renovation of a multi-residential development in Parsons, Kansas. Working plans call for the renovation of a multi-residential development.
Cost Estimates: For Base Bid #1, the cost range is from $170,000 to $195,000. For Base Bid #2, the cost range is $29,000 to $40,000. The Parsons Housing Authority (PHA) is seeking Proposals from qualified firms to provide all labor and materials for Modernization project referenced above. The Work includes Two Base Bid Items. Base Bid 1 includes repairs to the bedroom ceilings at selected apartments at the Stepping Stone Gardens (SSG). Base Bid 2 includes replacement of (3) hollow metal exterior doors and frames on the first floor of Belmont Towers. Bids are to include all necessary labor, materials and equipment. Any questions regarding the RFP should be directed to Richard Zingre, Project Architect at Zingre and Associates, PA. rzingre@gmail.com or 620-223-6030 voice. a) The Project is being bid as two separate Base Bid items. Bidders can bid on one or both bid items but the award will be made to the lowest responsible and responsive bidder under each base bid. b) Base Bid Number 1 - Ceiling Repairs at Stepping Stone Gardens (SSG): This is a lump sum bid for all work identified as Phase 1, which includes ceiling repairs to bedrooms at selected apartments. i) For Base Bid 1, the work includes: (1) Temporary relocation of tenant furnishings (2) Temporary demo of ceiling mounted devices such as lights, fans smoke alarms, registers, etc. (3) Furring of the ceiling to provide a level plane for the attachment of new gyp. board (4) New gyp board with perimeter wood trim at ceiling/wall joint. (5) Finish and painting of the new ceilings (6) Replacement of the ceiling fixtures (7) Replacement of tenant furnishings (8) Other work items as noted for Base Bid #1 ii) Deduct Alternate Number 1A - Omit all ceiling repair work for a single, 3-bedroom apartment. This is a deduct, lump sum amount to omit all ceiling repair work for all bedrooms in a single 3 bedroom apartment. iii) Deduct Alternate Number 1B - Omit all ceiling repair work for a single, 4-bedroom apartment. This is a deduct, lump sum amount to omit all ceiling repair work for all bedrooms in a single 4 bedroom apartment. c) Base Bid Number 2 - Door Replacement at Belmont Towers: This is a lump sum bid for all work identified as Phase 2, which includes replacement of 3 exterior hollow metal doors, frames and hardware on the first floor of Belmont Towers i) For Base Bid 2, the work includes: (1) Demo and salvage door alarm systems and signage that relates to the alarms (2) Demo the doors, frames and hardware for these hollow metal doors. (3) Install the new hollow metal doors, frames and hardware. (4) Field paint the new doors (5) Re-install the new alarms and signage. (6) Other work items as noted for Base Bid #1 (7) Complete additional work items identified on the plans as needed for a complete and working installation. d) The Contractor is responsible for daily cleanup of the work areas, and for hauling these items off for disposal off site. e) All work shall be completed in compliance with these contract documents f) Weekly certified payroll reports (CPR's) shall be completed and submitted to the Owner for review No 5% Bid security is required. If the Contractor would like to receive progress payments during the work, the Owner will require some form of assurance of competition. Suitable forms of assurance could be one of the following: i) 100% performance and payment bonds ii) 20% cash escrow in the form of a cashier's check iii) 25% irrevocable letter of credit The Housing Authority reserves the right to reject any or all proposals and to award the contract in the best interest of the Authority.
Final Planning
Multi-Residential
$434,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 11, 2025
February 14, 2026
Multiple Locations, Parsons, KS
Related To This Project
Parsons, KS
Bid Date: Sep 17 2025
Parsons, KS
Bid Date: Oct 21 2025
Parsons, KS
Bid Date: Sep 30 2025
Parsons, KS
Bid Date: Dec 11 2025
Parsons, KS
Bid Date: Dec 10 2025
Parsons, KS
Bid Date: Dec 09 2025
Parsons, KS
Bid Date: Jun 12 2025
Parsons, KS
Bid Date: Aug 14 2025
Parsons, KS
Bid Date: Mar 27 2025
Parsons, KS
Bid Date: Feb 24 2025
Parsons, KS
Bid Date: Mar 11 2025
Parsons, KS
Bid Date: Feb 20 2025
Parsons, KS
Bid Date: Feb 20 2025
Parsons, KS
Bid Date: Mar 13 2025
Parsons, KS
Bid Date: Jan 22 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.