Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 18, 2025 at 7:00 PM
Updated December 19, 2025
Site work and new construction of a water / sewer project in Park Hill, Oklahoma. Working plans call for the construction of a 2,400-square-foot, one-story above grade water / sewer project; and one-story above grade water / sewer project.
As Of December 18,2025 Project will go t Rebid but no definite date for REBID. Provide and install backup power generator, Automatic Transfer Switch (ATS), and generator pad for new water treatment plant. Refurbish and move two pre-purchased used Tri-Mite Adsorption Clarification/Filtration units, including all labor and necessary parts such as new effluent pumps, backwash pump, adsorption beads, filter media, underdrain system, turbidimeters, controllers, air blowers, electrical, and system control panel. The Burnt Cabin RWD will provide a list of pre-purchased automatic valves at the pre-construction meeting. Construct two residual lagoons with manholes, piping, 60-Mil HDPE Geomembrane lagoon liners, floating decanter system, lagoon decant lift station with submersible pumps and piping to return decant to the water treatment plant. Perform necessary dirt work for the construction of the new residual lagoons as specified in the plans and specifications. Indian preference will be given to parties with current certification from the Cherokee Nation Tribal Employment Office (TERO); proof of certification must be included in the bid. A bid bond of 5% is required. No bid withdrawals are allowed within 45 days of the opening. The Owner reserves the right to reject any or all bids and waive any irregularities or technicalities. Contractors must obtain plans and specifications from the Engineer and be registered on the Engineer's bid list to be eligible. Proposals must be received by the designated office by the specified time. Question Deadline 11/28/2025 Questions regarding documents, discrepancies, omissions, or intent of the specifications or drawings shall be submitted in writing to the Owner through the Engineer at least seven (7) days prior to bid closing to provide time for issuing and forwarding an addendum.
Final Planning
Water / Sewer
$5,000,000.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 12, 2025
June 19, 2026
17426 W 929 Rd, Park Hill, OK
Related To This Project
Park Hill, OK
Bid Date: Aug 18 2025
Park Hill, OK
Bid Date: May 19 2025
Park Hill, OK
Bid Date: Mar 10 2025
Park Hill, OK
Bid Date: Apr 21 2025
Park Hill, OK
Bid Date: Jan 27 2025
Park Hill, OK
Bid Date: Jan 23 2025
Park Hill, OK
Bid Date: Jan 21 2025
Park Hill, OK
Bid Date: Oct 31 2024
Park Hill, OK
Bid Date: Aug 26 2024
Park Hill, OK
Bid Date: Jun 17 2024
Park Hill, OK
Bid Date: Jun 17 2024
Park Hill, OK
Bid Date: May 24 2024
Park Hill, OK
Bid Date: Jun 26 2024
Park Hill, OK
Bid Date: Jun 03 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
